Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Aniel Luna



Project Estimator

Matt F.



Contact Information

75-77 Grove Street
Paterson, NJ 7503



Telephone

(973) 413-1912



Fax

(973) 684-1355



Railroad Construction Company Inc
is seeking qualified DBEs, MBEs, WBEs, PANYNJ MBEs, PANYNJ WBEs, PANYNJ MWBEss


Project Name

Bergen County Utility Authority - Edgewater Pump Station Project



Bid/Contract #

210 A



Awarding Agency

Bergen County Utility Authority



Project Location

Edgewater, Bergen County, NJ



Bid Date

04/23/2024 at 12:00



Project Details

Project Duration: 630 CD
Buy America: YES
PLA: YES
Prevailing Wage: YES
OCIP: NO
MWDBE Goals: 10% SED

ESTIMATING: KERRY SMITH - BIDGROUP@RCCMAIL.NET

Please use the following link for access to bid documents: https://securecc.smartinsight.co/#/PublicBidProject/749243

Scopes of Work (but not limited to): Electrical, Decommissioning, Mechanical, Precast/Concrete Work, Instrumentation & Controls, Demolition, Plumbing/HVAC, Roofing, Paving, Piles/Caissons, Asbestos Abatement, Blasting, etc.



Project Description:
1. Demolition of Sludge Dewatering Building, Smokestack Retaining Wall, and Pipe Tunnel.
2. Demolition of all Mechanical Equipment Located in Sludge Dewatering Building (boiler, etc.).
3. Removal of Generator Fuel tank and Appurtenances and activation of temporary emergency generator system.
4. Demolition of Oxygen System (Cryogenic Units and all associated equipment) and activation of new temporary O2 system.
5. Tie in of new Electrical Service.
6. Construction of a Pump Station.
7. Construction of a Dumpster Building.
8. Construction of a Retaining Wall.
9. Construction of concrete pad to support a Backup Generator.
10. Construction of an Odor Control Unit and grating system
11. Installation of new manholes and ductile iron pipes, to divert the entire plant flow to the new Pump Station.
12. Demolition of Screenings Building (above ground shed) and modification of existing Screenings Building including construction of a new Parshall Flume and to divert flow from existing Screenings Building to a new manhole.
13. Decommissioning and cleaning of all pipes and process tanks no longer required for treatment as part of decommissioning of the entire existing treatment plant.

*Always include your full company name & contact information. Please include project name, contract # & your SCOPE OF WORK in your email*

RAILROAD CONSTRUCTION COMPANY, INC IS AN EQUAL OPPORTUNITY EMPLOYER.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.