Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Kirsten Foley



Project Estimator

Kody King



Contact Information

P.O. Box 1006
Eureka, CA 95502



Telephone

(707) 443-6371



Fax

(707) 443-0277



Mercer-Fraser Company
is seeking qualified DBEss


Project Name

Modify CMS Systems & Furnish Sign Structure (Versatile Truss)



Bid/Contract #

08-1J8604



Awarding Agency

CALTRANS



Project Location

San Bernadino at Various Locations, San Bernadino County, CA



Bid Date

04/03/2024 at 14:00



Project Details

LEAD COMPLIANCE PLAN (INFORMATIONAL), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMP BARRIER SYSTEM, TEMP PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN & REPORTING, TEMP SOIL BINDER, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP CONSTRUCTION ENTRANCE, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, NOISE MONITORING, CLEAR & GRUB, ROADWAY EXCAVATION, IMPORTED BORROW, HYDROSEED, COMPOST, CLASS 2 AGGREGATE BASE, PRIME COAT, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, REMOVE ASPHALT CONCRETE DIKE, CAST-IN-DRILLED-HOLE CONCRETE PILE, STRUCTURAL CONCRETE, FURNISH & INSTALL SIGN STRUCTURE, REMOVE INLET, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, REMOVE CONCRETE, MISC IRON & STEEL, DELINEATOR, GUARD RAILING DELINEATOR, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, TRANSITION RAILING, END CAP, END ANCHOR ASSEMBLY, BURIED POST END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, REMOVE GUARDRAIL, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS



Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.