Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Mike Hutchings



Project Estimator

Mike Hutchings



Contact Information

45 Morrison Avenue
Sacramento, CA 95838



Telephone

(916) 283-9950



Fax

(916) 614-9520



Myers & Sons Construction, LLC
is seeking qualified DBEss


Project Name

Highway 5 Drainage and Sand Shed Replacement



Bid/Contract #

07-352304



Awarding Agency

Caltrans



Project Location

Los Angeles, Los Angeles County, CA



Bid Date

05/01/2024 at 02:00



Project Details

Myers & Sons Construction, LLC is seeking DBE Subcontractors and Suppliers to bid on an upcoming project with Caltrans, Highway 5 Drainage and Sand Shed Replacement, Contract #07-352304, Bidding on 5/1/2024 at 2:00 pm PST, with a 22% DBE goal. The general work description is to replace drainage systems, install GSRD and replace sand shed. This project is in Los Angeles County near Castaic. All items are available to bid on including, but not limited to items normally Myers & Sons would self-perform:

TRAFFIC CONTROL, CONSTRUCTION AREA SIGNS, ALL SIGNAGE & SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY BARRIER SYSTEM, TEMPORARY CRASH CUSHION MODULE, TEMPORARY HYDRAULIC MULCH, TEMPORARY COVER, CLEARING & GRUBBING, LANDSCAPING, IRIGATION, SWPP, LEAD COMPLIANCE, GUARDRAIL, TRUCKING, STREET SWEEPING, ALL MATERIALS, STRIPING, FENCING, HMA, PLACE HOT MIX ASPHALT DIKE (ALL TYPES), RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
AND ALL OTHER ITEMS LISTED ON THE PLANS AND SPECS.

Plans and Specs can also be downloaded through https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-352304&sub=.



Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can also be downloaded through Plans and Specs can also be downloaded through https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-352304&sub=.

Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.