Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Kirsten Foley



Project Estimator

Mark Benzinger



Contact Information

P.O. Box 1006
Eureka, CA 95502



Telephone

(707) 443-6371



Fax

(707) 443-0277



Mercer-Fraser Company
is seeking qualified DBEss


Project Name

RHMA-G, HMA, Cold Plane AC & Soldier Pile Retaining Wall



Bid/Contract #

02-3H70U4



Awarding Agency

Caltrans



Project Location

Del Loma, Trinity County, CA



Bid Date

07/23/2024 at 14:00



Project Details

LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE SIGNAL SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP RAILING, TEMP CRASH CUSHION, AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, WPCP, TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, INVASIVE SPECIES CONTROL, REMOVE CONCRETE, CLEAR & GRUB, ROADWAY EXCAVATION, SHOULDER BACKING, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, CONCRETE BACKFILL, LEAN CONCRETE BACKFILL, DITCH EXCAVATION, HYDRAULIC BIOTIC GROWTH MEDIUM, BONDED FIBER MATRIX, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, ASPHALT-RUBBER BINDER, PRECOATED AGGREGATE, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT, MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, DATA CORE, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, TACK COAT, REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, GROUND ANCHOR, STEEL SOLDIER PILE, 30" DRILLED HOLE, STRUCTURAL CONCRETE, MINOR CONCRETE, PRECAST CONCRETE LAGGING, BAR REINFORCING STEEL, TIMBER LAGGING, CLEAN & PAINT STEEL SOLDIER PILING, CONCRETE BACKFILL, POLYMERIC SHEET COATED CORRUGATED STEEL PIPE, CORRUGATED STEEL PIPE ARCH, ANCHOR ASSEMBLY, DRAINAGE INLET MARKER, BIOFILTRATION SOIL MEDIA, ABANDON CULVERT, REMOVE CULVERT, REMOVE INLET, REMOVE HEADWALL, ROCK SLOPE PROTECTION, MISC IRON & STEEL, PREPARE & STAIN CONCRETE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER, REMOVE MARKER, MARKER, TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE ROADSIDE SIGNS, REMOVE ROADSIDE SIGNS, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, SINGLE THRIE BEAM BARRIER, CABLE RAILING, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, BURIED POST END ANCHOR, ALTERNATIVE CRASH CUSHION, CONCRETE BARRIER TRANSITION, CONCRETE BARRIER, REMOVE GUARDRAIL, REMOVE CRASH CUSHION, THERMOPLASTIC PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC CROSSWALK & PAVEMENT MARKING



Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.