Jamie Miranda
1 Harbor Center, Suite 200
Suisun City, CA 94585
(707) 410-5070
(000) 000-0000
Upper Llagas Creek Flood Protection Phase 2B
C0695
Santa Clara Valley Water District
San Martin, Santa Clara County, CA
06/26/2024 at 02:00
Shimmick Construction Company, Inc. welcomes quotes from subcontractors and suppliers on complete or partial portions of work, including (but not limited to) the following:
Subcontractors: Bridge Rail Concrete; Clear & Grub; Contaminated Soil; Coring; Crash Cushion; Demolition; Dewatering; Drill Bond; Earthwork; Electrical; Environmental; Erosion Control; Fencing; Flatwork; Grinding AC; Grouting; Landscape; Paving; Piles; Rebar; Shoring; Signs; Structural Steel; Survey; Traffic Control; Trucking; Utility Work; Welding
Suppliers: Aggregate; Misc. Metals; Precast Utility; Piping
Plans and specifications may be viewed and downloaded via PlanetBids: https://vendors.planetbids.com/portal/48397/bo/bo-detail/116593. You may also contact Jamie Miranda at jmiranda@shimmick.com for a DropBox link.
This project is subject to Prevailing Wage rates. All items of work listed above are made available, even items of work normally performed by Shimmick. Assistance is available for qualified subcontractors in obtaining necessary equipment, supplies, or materials.100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction’s listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Devin Nordhagen at devin.nordhagen@shimmick.com.
Subcontractors and Suppliers with any technical questions or who may require assistance obtaining necessary equipment, supplies, materials, bonding, insurance, estimating, breaking of work into smaller incremental pieces or related assistance or services may contact lead estimator Aaron Lai at alai@shimmick.com.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.