Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Suzie Ransom



Project Estimator

Brad Sanders



Contact Information

195 Concourse Blvd. A
Santa Rosa, CA 95402



Telephone

(707) 527-9968



Fax

(707) 527-0244



K. G. Walters Construction Co., Inc.
is seeking qualified SBA MBEs, SDBs, WOSBss


Project Name

Quill Water Treatment Plant Rehabilitation



Bid/Contract #

25300022



Awarding Agency

Carson City Purchasing and Contracts



Project Location

Carson City, Carson County, NV



Bid Date

08/13/2024 at 11:00



Project Details

K.G. Walters Construction is seeking qualified certified DBE subcontractors and suppliers for the Carson City Quill Water Treatment Plant Rehabilitation. Quotes requested include but aren't limited to the following scopes of work: temp office, landscaping/revegetation, demolition, concrete forms, rebar, CIP concrete, masonry, ,misc. metals, handrail, rough carpentry, casework, waterproofing, insulation, roof specialties, metal doors & frames, overhead doors, nonstructural metal framing, drywall, tile, acoustical ceilings, resilient flooring, painting and Coating, signs, toilet and bath accessories, safety equipment, metal building systems, fire sprinklers, plumbing, HVAC, electrical & controls, security and fire alarms, dewatering, aggregates, shoring, AC paving, process pipe, precast, pipe supports, mechanical insulation, mixers, tanks, pumps, chemical equipment, packaged treatment system, and UV equipment.


An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.

Standard payment terms are 95% progress payments, 5% retention unless other terms are provided for in prime contract. Subcontractors, suppliers and vendors shall apply the same affirmative steps for DBE participation as required in the specifications to be responsive.

This Project must comply with American Iron and Steel (AIS) requirements. AIS manufacturer’s certifications must meet EPA provisions

Subcontractors must possess a valid contractor license, and current insurance meeting K.G. Walters requirements. Subcontractors will be required to sign K.G. Walters Construction standard subcontract agreement.

Quotations must be valid for 60 days after specified award date by owner.

Bid documents are available at: https://www.ngemnv.com/



An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.