Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Kirsten Foley



Project Estimator

Kody King



Contact Information

P.O. Box 1006
Eureka, CA 95502



Telephone

(707) 443-6371



Fax

(707) 443-0277



Mercer-Fraser Company
is seeking qualified DBEss


Project Name

HMA, RHMA, Cold Plane AC Pavement



Bid/Contract #

01-0H5504



Awarding Agency

Caltrans



Project Location

Longvale, Mendocino County, CA



Bid Date

07/31/2024 at 14:00



Project Details

LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, MOVE-IN/MOVE-OUT (TEMP EROSION CONTROL), TEMP MULCH, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP REINFORCED SILT FENCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, SHOULDER BACKING, IMPORTED BORROW, WOOD MULCH, ROLLED EROSION CONTROL PRODUCT, CRACK TREATMENT, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, ENTRANCE TAPER, REMOVE ENTRANCE TAPER, REMOVE OVERSIDE DRAIN, MODIFY INLET, FRAME & GRATE, CHAIN LINK FENCE, CHAIN LINK GATE, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER, REMOVE ROADSIDE SIGN, RELOCATE SIGN PANEL, FURNISH LAMINATED PANEL SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, INSTALL ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), VEGETATION CONTROL MAT, SINGLE THRIE BEAM BARRIER, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, ALTERNATIVE CRASH CUSHION, REMOVE & RECONSTRUCT GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), RUMBLE STRIP, SINUSOIDAL RUMBLE STRIP GROUND-IN INDENTATIONS, RUMBLE STRIP, SINUSOIDAL RUMBLE STRIP GROUND-IN INDENTATIONS, TRAFFIC STRIPE TAPE WITH CONTRAST, MODIFYING TRAFFIC MONITORING STATIONS, REMOVING TRAFFIC MONITORING STATIONS



Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.