Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Jamie Miranda



Contact Information

1 Harbor Center, Suite 200
Suisun City, CA 94585



Telephone

(707) 759-6858



Fax

(510) 777-5099



Shimmick Construction Company, Inc.
is seeking qualified MBEs, WBEs, SBEs, Labor Surplus Area Firms (LSA)s


Project Name

WWTF Electrical System Hazard Mitigation



Bid/Contract #

WW-22-14797



Awarding Agency

City of Watsonville



Project Location

Watsonville, Santa Cruz County County, CA



Bid Date

08/06/2024 at 02:00



Project Details

Shimmick Construction Company, Inc. is requesting quotes from Small Business Firms (SB), Minority Firms (MBE), Women Owned Firms (WBE), and Labor Surplus Area Firms (LSA) in the following scopes of work:

Subcontractors: Clear & Grub; Contaminated Soil; Coring; Demolition; Dewatering; Drill-Bond; Earthwork; Erosion Control; Flatwork; Joint Seal; Landscape; Masonry; Mechanical; Painting; Paving; Piles; Rebar; Roofing; Shoring; Survey; Trench Shoring; Trucking; Utility Work; Waterproofing; Welding

Suppliers: Aggregate; Doors; Falsework Material; Joint Seal; Mechanical Equipment; Misc. Metal; PVC Pipe; Precast Utility; Ready Mix; CMP Utility Pipe



Plans and specifications may be viewed/obtained OpenGov Procurement. You may also contact Jamie Miranda at jmiranda@shimmick.com for a download link.

Should you require assistance with your bid, please contact our lead estimator Aaron Lai at alai@shimmick.com.

All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator listed above for assistance with breaking down items of work into economically feasible units, with assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or related assistance. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction’s listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Amanda Mobley at amanda.mobley@shimmick.com.

This project is funded in part by a Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) grant and the California Governor’s Office of Emergency Services (CalOES) Prepare California Match grant. This contract requires compliance with the Davis-Bacon wage rates. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.