Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Mike Lewis



Project Estimator

Mike Lewis



Contact Information

45 Morrison Avenue
Sacramento, CA 95838



Telephone

(916) 283-9950



Fax

(916) 614-9520



Myers & Sons Construction, LLC
is seeking qualified DBEss


Project Name

Dog Bar Road over Bear River Bridge Replacement Project



Bid/Contract #

224024



Awarding Agency

Nevada County - Department of Public Works



Project Location

Nevada City, Nevada County, CA



Bid Date

08/13/2024 at 14:30



Project Details

Myers & Sons Construction, LLC is seeking DBE Subcontractors and Suppliers to bid on an upcoming project with Nevada County, CA, Contract No. 224024, Bidding on 8/6/2024 at 2:30 pm, with a 20% DBE goal. The work to be done, in general, consists of constructing a new bridge, grading, paving, striping, installing MGS and removing the existing bridge. The work will be completed in two stages. Stage 1 is the construction of the new bridge and road approaches. Stage 2 is the demolition of the existing bridge and finishing the road approach construction. The two stages will be separated by up to two winter suspensions to be determined by the Engineer. Plans and Specs can be downloaded at https://www.publicpurchase.com/gems/bid/bidView?bidId=189696&.

All items are available to bid on including, but not limited to items normally Myers & Sons would self-perform: Lead Compliance Plan, SWPP, Construction Area Signs, Traffic Control System(s), Signage, Erosion Control, Clearing and Grubbing, Landscaping, All Excavation, Bridge Removal, Rebar, Imported Borrow, Rock Slope Protection, Striping, Railing(s), Asphalt, Joint Seals, Fencing, Construction Materials, Trucking, etc.



Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can be downloaded at https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-3W5604&sub=.

Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.

** All items are open for bid, including items of work normally performed by Myers & Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers & Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages. **




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.