Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Tricia Salmon



Project Estimator

Dan Shults - Dan.Shults@kiewit.com 607-433-2100



Contact Information

470 Chestnut Ridge Road
Woodcliff Lake, NJ 7677



Telephone

(323) 574-2432



Fax

(000) 000-0000



Jett Industries, Inc.
is seeking qualified MBEs, WBEss


Project Name

Orangeburg WWTP Sludge Thickeners Upgrade



Bid/Contract #

20057257



Awarding Agency

Rockland County Sewer District 1



Project Location

Orangeburg , Rockland County, NY



Bid Date

08/19/2024 at 02:00



Project Details

Jett Industries Inc. (Jett - Contractor) is assembling a bid for Contract No. RFB-RC-SWR-2023-04 - WWTP Sludge Thickeners Upgrade Project in Orangeburg, NY with The Rockland County Sewer District No. 1 (RCSD - Owner) and extends this Request for Quotes (RFQ) to all firms (Bidder) to provide labor, materials, and/or equipment for the Project as described in these bid packages.

· Access to Bid Documents
Project and Scope specific documents will be posted to the FILES tab of Building Connected.

· Issuance of Addenda by RCSD
KIC will upload addenda to Building Connected internet site as received by the owner. A notification through Building Connected will be sent to Bidders. Bidders are required to acknowledge receipt of addenda in writing on Bid Proposal form or their quote.

· Requests for Clarification
Any Bidder, no later than the date posted on the Project Information Page, may submit questions for interpretation or clarification of, or addenda to, this Bid. All requests must be submitted in writing and sent by email or as a message through Building Connected

· M/WBE Goal:
This project has a New York State certified 10% MBE participation goal and a 6% WBE participation goal. Jett encourages minority and women business enterprise (M/WBE) firms to quote our projects, as well as subcontractors and materials suppliers who contract with our firm to utilize MWBE subcontractors and vendors for work to be performed.

· The Project includes the following Work:
1. Replacement of four (4) gravity thickener equipment including, but not limited to, mechanisms, motors, drives, catwalks, railings, and weirs.
2. Replace thickener feed piping internal to thickener tanks.
3. Replace four (4) distribution box slide gates.
4. Furnish and install ten (10) magnetic flow meters: two (2) A-Side primary sludge, two (2) A-Side secondary sludge, one (1) A-Side dilution water, two (2) B-Side primary sludge, two (2) B-Side secondary sludge, one (1) B-Side dilution water.
5. Furnish and install B-Side overflow modifications.
6. Furnish and install B-Side thickener bypass connection pipping and valving, including modifications to A-Side distribution box.
7. Furnish and install digester bypass piping and valving in the digester building.
8. Miscellaneous concrete repairs.
9. Replacement of electrical components for four (4) gravity thickeners.
10. Furnish new lighting for the thickeners.
11. Furnish instrumentation wiring for new flow meters.
12. Architectural and structural modifications.

Scopes of Work needed:
Process Equipment
Electrical subcontractors
AG Pipe
Core Drills
Spall & Crack Repair
Painting & Coating
Concrete Demolition
Electrical Ductbank
Misc. Metals fabrication
Architectural supplies and subcontractors

Additional Project Details:
Union preferred
Prevailing Wage/Davis-Beacon Act Requirement
There will be a PLA attached to this project
American Iron & Steel requirement



Drawings & Specifications
Contract documents, including plans & specifications can be viewed and downloaded at: https://app.buildingconnected.com/public/545c695dc26ca11600879dd8


The Bidder will be required to quote in compliance with all project plans and specifications. Non-Disclosure Agreements are provided when applicable. Addenda is posted and notification is sent to all invited bidders.

Insurance Requirements
Upon award, Subcontractors must provide insurance in accordance with our subcontract agreement. A copy of the subcontractor agreement can be found in Building Connected Project Plan Room.

Bonding Requirements
For subcontracts the Bidder shall furnish Performance and Payment Bonds equal to the full subcontract price. For Material Contracts, the bidder shall furnish Supply Bonds in amount equal to full Material Contract price. Bond premiums are reimbursable by Kiewit/Mass. Electric Construction Co. Jett Industries Inc.
Please provide current bond rate with Quote/Proposal or advise if you are unable to bond so that we my address this issue.

Submission of Proposals & Quotes
Proposals & Quotes from Contractors & Suppliers must be submitted on or prior to bid due date listed above. You can submit your quote three (2) ways:

1) Upload your proposal to Building Connected
2) E-mail your quote/ proposal to Project Estimator Listed or procurementwcl@kiewit.com


How to get in touch

Outreach Coordinator
Patricia Salmon
323-574-2432

Project Estimator
Dan Shults
Dan.shults@kiewit.com Telephone 607-433-2100
470 Chestnut Ridge Road
Woodcliff Lake, NJ 07677

https://app.buildingconnected.com/public/545c695dc26ca11600879dd8




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.