Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Marshall Harmon



Project Estimator

Marshall Harmon



Contact Information

1168 INDUSTRIAL ST.
REDDING, CA 96002



Telephone

(530) 223-6605



Fax

(530) 223-3879



STIMPEL-WIEBELHAUS ASSOCIATES, INC.
is seeking qualified DBEss


Project Name

CONSTRUCTION ON STATE HIGHWAY IN SANTA CRUZ COUNTY FROM 0.9 MILE NORTH OF BUENA VISTA DRIVE UNDERCROSSING TO 0.2 MILE SOUTH OF ROB ROY JUNCTION OVERCROSSING



Bid/Contract #

Contract # 05-1P1804



Awarding Agency

Caltrans



Project Location

Rob Roy Junction, Santa Cruz County, CA



Bid Date

08/13/2024 at 02:00



Project Details

SWA is seeking bids from qualified subcontractors and suppliers for the following items: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMPORARY PAVEMENT MARKER, TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY CRASH CUSHION TL-3, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MOBILIZATION.



STIMPEL-WIEBELHAUS ASSOCIATES, INC. (SWA) WILL WORK WITH INTERESTED SUBCONTRACTORS TO IDENTIFY OPPORTUNITIES TO BREAK DOWN ITEMS INTO ECONOMICALLY FEASIBLE PACKAGES TO ENCOURAGE MINORITY CONTRACTOR PARTICIPATION.
SWA IS A UNION SIGNATORY CONTRACTOR AND SUBS SHALL BE REQUIRED TO BE OR TO SIGN AN APPROVED ONE TIME TERMS/CONDITIONS AGREEMENT.
PLANS AND SPECIFICATIONS ARE AVAILABLE FOR VIEWING AT OUR OFFICE OR CAN BE DOWNLOADED FROM THE OWNERS WEBSITE. PLEASE CONTACT SWA FOR ANY FUTHER ASSISTANCE AND IF ANY HELP IS NEEDDED IN OBTAINING BONDING, INSURANCE, EQUIPMENT, MATERIALS, OR SUPPLIES.
SWA INTENDS TO WORK COOPERATIVELY WITH ALL QUALIFIED FIRMS SEEKING TO WORK ON THIS PROJECT.
WE ARE AN EQUAL OPPORTUNITY EMPLOYER AND WILL CONSIDER ANY AND ALL BIDS THAT MAY BE SUBMITTED.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.