Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Joel Piazza



Contact Information

P.O. Box 573
Penngrove, CA 94951



Telephone

(707) 876-3410



Fax

(000) 000-0000



Piazza Construction
is seeking qualified MBEs, WBEs, SBEss


Project Name

Parr Tank and Pipeline Project



Bid/Contract #

038-001



Awarding Agency

North Gualala Water Company



Project Location

Gualala, Mendocino County, CA



Bid Date

08/15/2024 at 14:00



Project Details

Piazza Construction is seeking the use of qualified DBE, MBE, SBE subcontractors and suppliers for the following aspects of the project: storm water pollution control plan, construction area signs, traffic control system, glass lined bolted steel tank, CIDH piles, rebar and rebar cages, CMU building, exterior door and hardware, pre-engineered roof trusses, standing seam metal roof, PVC C900 water pipe and pipe fittings, pipe bedding, class 2 base rock, asphalt concrete, water service components, skid mounted booster pump and associated components, light pole, fixture and base, electrical, instrumentation and telemetry.



Project documents can be viewed and downloaded at https://www.dropbox.com/scl/fo/agh69g01yjqy0scfujg5y/ANkDeZDvsvU2UjgxSCD0o4o?rlkey=856scq4omlfh2bovecv7yylm4&e=1&st=xu34ol11&dl=0

100% performance and payment bonds may be required. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance. Contractors and suppliers to provide proof of current, MBE, WBE, SBE certification with proposal. Subcontractor shall take out and maintain during the life of the contract, a Commercial General Liability Policy, with a minimum limit as defined within the contract documents, naming Piazza Construction as additionally insured.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.