Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Jocelyn Parady



Project Estimator

James Folsom



Contact Information

24339 State Highway 89 North
Burney, CA 96013



Telephone

(530) 335-5501



Fax

(530) 335-5510



Hat Creek Construction & Materials, Inc.
is seeking qualified DBEss


Project Name

Caltrans 02-4H0604 Hwy 36



Bid/Contract #

02-4H0604



Awarding Agency

Caltrans



Project Location

Chester, Lassen and Plumas County, CA



Bid Date

10/10/2024 at 02:00



Project Details

Hat Creek Construction & Materials, Inc. (HCCMI) is seeking quotes from all qualified subcontractors/suppliers including but not limited to DBE for the following items of work: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (LS), DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE (LS), TYPE III BARRICADE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS), PORTABLE CHANGEABLE MESSAGE SIGN (LS), AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, JOB SITE MANAGEMENT, STORM WATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), TEMPORARY HIGH-VISIBILIITY FENCE, CLEARING AND GRUBBING (LS), REMOVE TREES, DUST PALLIATIVE, ROADWAY EXCAVATION, ROCK EXCAVATION, SHOULDER BACKING, MOVE-IN/MOVE-OUT (EROSION CONTROL), DRY SEED (SQFT), HYDRAULIC BIOTIC GROWTH MEDIUM, BONDED FIBER MATRIX (SQFT), FIBER REINFORCED MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (BLANKET), FINISHING ROADWAY, CLASS 2 AGGREGATE BASE (CY), ASPHALT-RUBBER BINDER, PRECOATED AGGREGATE (SEAL COAT), REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT (TYPE D), PLACE HOT MIX ASPHALT (TYPE E), PLACE HOT MIX ASPHALT (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, RAIL ELEMENT WALL, (F) - STRUCTURAL CONCRETE DRAINAGE INLET, (F) - MINOR CONCRETE (MINOR STRUCTURE), (F) - CONCRETE BACKFILL (PIPE TRENCH), 24" CORRUGATED STEEL PIPE (.138" THICK), 30" CORRUGATED STEEL PIPE (.138" THICK), 36" CORRUGATED STEEL PIPE (.138" THICK), 48" CORRUGATED STEEL PIPE (.138" THICK), 18" CORRUGATED STEEL PIPE (.138" THICK), 8" PERFORATED PLASTIC PIPE UNDERDRAIN, 8" PLASTIC PIPE (UNDERDRAIN OUTLET), 12" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK), 24" CORRUGATED STEEL PIPE DOWNDRAIN (.138" THICK), 12" ENTRANCE TAPER, 12" DOWNDRAIN SLIP JOINT, 12" ANCHOR ASSEMBLY, 24" ANCHOR ASSEMBLY, DRAINAGE INLET MARKER, 36" CORRUGATED STEEL PIPE INLET (.138" THICK), 24" STEEL FLARED END SECTION, 30" STEEL FLARED END SECTION, 36" STEEL FLARED END SECTION, 48" STEEL FLARED END SECTION, ABANDON CULVERT (LF), REMOVE OVERSIDE DRAIN, REMOVE CULVERT (LF), REMOVE DOWNDRAIN (EA), REMOVE INLET, REMOVE HEADWALL, REMOVE FLARE END SECTION (EA), MODIFY INLET, CLEANING, INSPECTING, AND PREPARING CULVERT (LF), SAND BACKFILL, 48" CURED IN-PLACE PIPELINER, ELEVATED CABLE NET DRAPERY, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS 1, METHOD B) (CY), CABLE NET DRAPERY, ROK SLOPE PROTECTION FABRIC (CLASS 8), (F) - MISCELLANEOUS IRON AND STEEL, ADJUST MANHOLE FROM AND COVER (UTILITY), DELINEATOR (CLASS 2), MILEPOST MARKER, UNDERDRAIN MARKER, TREATMENT BEST MANAGEMENT PRACTICE MARKER, OBJECT MARKER (TYPE L-1), REMOVE MARKER, REMOVE ROADSIDE SIGN (WOOD POST), REMOVE ROADSIDE SIGN (STEEL POST), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" - FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - FRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, RECONSTRUCT TURNTABLE ROADSIDE SIGN, MIDWEST GUARDRAIL SYSTEM (STEEL POST), MIDWEST GUARDRAIL SYSTEM (8' STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE AGT), END ANCHOR ASSEMBLY (TYPE SFT - M), ALTERNATIVE IN-LINE TERMINAL TL-3, BURIED POST END ANCHOR (TYPE B-S), ALTERNATIVE CRASH CUSHION TL-3, (F) - CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, SALVAGE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT, 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED, BROKEN 12-3), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED, BROKEN 36-12), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING LIGHTING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, MODIFYING FLASHING BEACON SYSTEMS, MOBILIZATION,



HCCMI is an equal opportunity employer and is willing to work with all qualified DBE firms interested on this project. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. If qualified firms need assistance in obtaining project plans, specifications, or requirements please contact estimating@hatcreekconstruction.com or our office at (530) 335-5501 or can also be viewed at 24339 State Highway 89 North, Burney, CA 96013. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bond may be required. Please call if you need assistance obtaining insurance, bonding, equipment, materials, and/or supplies. HCCMI intends to work cooperatively with all qualified firms seeking work on this project. We will work with any interested subcontractor/supplier to identify opportunities to break items into economically feasible packages. All DBE firms must be certified by bid date.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.