Reyes Construction, Inc.
is seeking qualified DBEss


Project Name

North Park/ Mid-City Bikeway: University Bikeway



Bid/Contract #

4250092



Awarding Agency

SANDAG



Project Location

San Diego, San Diego County, CA



Bid Date

10/03/2024 at 02:00



Project Details

We are seeking quotes from Certified DBE Subcontractors and Supliers for the following trades:

(Subcontractors)- Electrical, Traffic Signal, Fencing, Guardrail, Clear & Grub, Asphalt Paving, Landscaping, Signage & Striping, Minor
Concrete, Asphalt Dikes, Hazardous Trucking, Trucking, Quality Control, Surveying, Slurry Seal, Industrial Hygienist,
Job Coordinator, Cold Mill Asphalt, Sawcutting, Street Sweeping, Traffic Control, Reinforcing Steel

(Suppliers)- Truncated Domes, Tree Grates, Misc. Metals, Ready Mix Concrete, Signage, BMP Materials, Waterworks, RCP, Crash
Cushion



We are an equal opportunity employer. Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies,
materials or related technical assistance. For information on the availability of scope of work, plans and specifications, please contact our office.

Plans, Specifications, and Contract requirements can be viewed online at no additional cost:
1) Via iSqFt: please send an email request to estimating@reyesconstruction.com
2) https://www.bidnetdirect.com/sandag

DBE Goal : 23%

Project Scope:

The work consists in general of approximately 2.8 miles of Class II and Class IV bikeway along University Avenue between Estrella Avenue and 70th Street within the City of San Diego and the City of La Mesa and approximately 0.25 miles of Bike Boulevard improvements on Estrella Avenue between Orange Avenue and University Avenue. Roadway improvements are required to accommodate the bikeway. Features include raised concrete medians, concrete curb & gutter, asphalt concrete dike, bus islands, a protected intersection, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping.

Work includes, but is not limited to, controlling for water pollution; traffic control; erosion control; clearing and grubbing; curb, gutter, cross gutter, driveway, colored concrete, and sidewalk work; roadway excavation; imported borrow; asphalt concrete pavement; PCC pavement; landscaping and irrigation; proprietary BMPs; wayfinding signage; pavement markings and signage; street lighting; trenching and backfill for underground electric conduits; water appurtenances and fire hydrant relocations; storm drain installation; traffic signal modifications. Additive alternate A consists of pavement rehabilitation and associated curb ramps, traffic signal modifications and other appurtenant work associated with rehabilitating the roadway along University Avenue. The work will also include the procurement of all materials and performing all other work necessary to complete the work in accordance with the project plans and specifications.