Main Wastewater Treatment Plant Secondary Clarifier Rehabilitation Phase 4
SD459
East Bay Municipal Utility District
Oakland, Alameda County, CA
10/09/2024 at 13:30
Work includes: (1) Rehabilitating Clarifiers 4 and 11 by replacing the clarifier equipment, refurbishing the
bridge, resurfacing the concrete surfaces, rebuilding drives, refurbishing influent gates, and
replacing electrical equipment,
(2) installing new sump pits at 5 clarifiers,
(3) installing new sump pumps at 6 clarifiers,
(4) providing new 120V, 208V, and 480V and control wiring for Clarifiers 8, 11, and 12,
(5) inspecting clarifier return activated sludge pipeline and providing Cure-In-Place Piping
rehabilitation if required for 2 clarifiers,
(6) inspecting the closed conduit secondary effluent channel,
(7) regrading and replacing the soil adjacent to the clarifiers with new material, and
(8) replacing actuators on the influent gates at 8 clarifiers.
Seeking all trades (but not limited to): Misc Metals, Demolition, and other required work and trades.
https://construction-bids.ebmud.com/SpecMain.aspx?SpecGN=9128&BidMode=Current
Plans, specifications, and requirements can be viewed at our office or by using the link below.
Please review all documents. By submitting a proposal your company agrees to Anvil Builders Inc standard subcontract. For assistance with bonding, lines of credit, insurance, or anything else regarding bidding on this project, contact Anvil Builders via phone or email.