Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Irish Galang



Project Estimator

Feliciano Mata



Contact Information

17510 W. Bethany Rd
Tracy, CA 95391



Telephone

(925) 800-1848



Fax

(000) 000-0000



Garney Pacific, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, WOSBs, DVBEss


Project Name

EBMUD MWWTP Secondary Clarifier Rehab Phase 4



Bid/Contract #

SD-459



Awarding Agency

East Bay Municipal Utility District



Project Location

Oakland, Alameda County, CA



Bid Date

10/09/2024 at 13:30



Project Details

We are seeking quotes for the following items:
Site Demolition, Metal Fabrications, Electrical & Instrumentation, Piping and Valves, Painting & Industrial Coatings, Electric Gate Operators.
(1)Rehabilitating Clarifiers (2) installing new sump pits at 5 clarifiers, (3) installing new sump pumps at 6 clarifiers, (4) providing new 120V, 208V, and 480V and control wiring for Clarifiers 8, 11, and 12, (5) inspecting clarifier return activated sludge pipeline and providing Cure-In-Place Piping rehabilitation if required for 2 clarifiers, (6) inspecting the closed conduit secondary effluent channel, (7) regrading and replacing the soil adjacent to the clarifiers with new material, and (8) replacing actuators on the influent gates at 8 clarifiers.



Plans are also available directly from the Construction Manager @ 510-986-7939, or on EBMUD’s website. EBMUD’s website is:
http://www.ebmud.com/current-construction-bids

Let us know if you need work items separated into smaller tasks or quantities to allow your participation. We will accommodate requests whenever possible and when economically feasible. Garney Pacific Inc. is looking for quotes for the referenced project. Garney is a union contractor, all subcontractors on the project must utilize union labor. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse Subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney Pacific unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions.

Garney Standard PO & Subcontract Forms: Standard Purchase Order and Subcontract documents can be downloaded via the link provided. These documents will be used as the basis of contracting with Garney for the above referenced project. If you have any exceptions to these documents please send redlines and comments with your quote.

Garney Pacific, Inc. is signatory to Laborers & Operators unions.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.