Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Kieran Woods



Contact Information

PO Box 947
South San Francisco, CA 94083



Telephone

(415) 759-0506



Fax

(415) 468-1359



K.J. Woods Construction, Inc.
is seeking qualified DBEss


Project Name

Linda Manor and Old Florin Town Septic to Sewer Conversion



Bid/Contract #

6035



Awarding Agency

Sacramento Area Sewer District



Project Location

Rio Linda and Florin Areas, Sacramento County, CA



Bid Date

10/25/2024 at 11:00



Project Details

All Work associated with this contract must include, but is not limited to, mobilization/demobilization, dewatering of excavations, sheeting, shoring, and bracing of excavation, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, installation of PVC and VCP by open cut, installation of HDPE by open cut and horizontal directional drilling, installation of casing by boring and jacking, permitting, site restoration, and additional items or details that are required by the Contract Documents to be performed, placed, constructed or installed.



Contract documents can be retrieved through the https://www.publicpurchase.com/gems/browse/home or at https://www.sacsewer.com/




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.