Josh Cook
Stephen George
155 Howe Road
Martinez, CA 94553
(925) 228-0317
(000) 000-0000
Phase 1 Groundwater Inflow Mitigation Project
LB 18-01
Lake Berryessa Resort Improvement District
Pope Valley, Napa County, CA
10/10/2024 at 11:30
EEGC is requesting bids from certified DBE, MBE, WBE, DVBE, and SBE Subcontractors and suppliers for trucking, PVC piping, inline cleanouts, 12" HDPE gravity main, and erosion control.
The primary objective of the project is to reduce groundwater infiltration into the pond system at the District’s wastewater treatment, storage and disposal parcel through the construction of cutoff walls and trenches; replacement of the existing treatment pond distribution, inlet, overflow and transfer piping, and construction of surface drainage and erosion control.
Any subcontractor performing work on the job is required to be registered with the Dept. of Industrial Relations. Please take into account when quoting the project: Prevailing Wage Rates, Certified Payroll, and Insurance Requirements.
Contact us with any assistance you may need relating to project documents, bonding, and insurance.
Please submit your quote by Close of Business on October 8, 2024
EEGC is an equal opportunity employer.