Victoria Lombardo
421 East Route 59
Nanuet, NY 10954
(845) 735-3511
(845) 735-3388
Manhattan Tunnel
GDC23-005
Gateway Tunnel Commission
Manhattan, Manhattan County, NY
11/15/2024 at 02:00
The Manhattan Tunnel is a Design-Build project which consists of two separate parallel "mined" single track rail tunnels, from 50 feet west of the Manhattan Bulkhead.
Scopes of work, services, material, and equipment necessary for this project include but are not limited to: Ground Water Control, Furnish and/or Furnish and Install Cast-In-Place Concrete tunnel liner, Utilities (Water, Sewer, Gas), Utility Relocation, Traffic Control, Trucking, Paving, Fencing, Scheduling, Safety Monitoring, Inspections, QA/QC, Environmental & DBE Compliance, Demo, Furnish & Install Rebar, Concrete sidewalks, Shotcrete, Sawcutting, Masonry, Misc. Metals, Electrical, Plumbing, HVAC, Tunnel Excavation, Tunnel Grouting, Asphalt, Landscaping and other trades typically associated with this type of work.
This project has DBE goals assigned to it. Gateway Tunnel Partners JV encourages and promotes the maximum MWDBE and SDVOB Participation possible on this and all of its Projects. All firms are encouraged to contact our main office to investigate how you can become involved in this Project with our team.
Please call (845) 735-3511 or email GTPbids@halmarinternational.com for further information or to request Bid Documents. All proposals are requested to be submitted on or before 5:00pm on Friday, November 15th.
Gateway Tunnel Partners JV is an Affirmative Action/Equal Opportunity Employer.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.