Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Adam Hanson



Project Estimator

Stephen Kubat



Contact Information

140 EMPIRE AVENUE
MODESTO, CA 95354



Telephone

(209) 523-0734 ext. 3160



Fax

(209) 523-4927



GEORGE REED, INC.
is seeking qualified DBEss


Project Name

Construction on State Highway in Amador County near Martell from 0.7 Mile West of Ione-Buena Vista Road to 0.2 Mile East of Kennedy Flat Road, 10-Ama-88-5.5/14.3, F.A.P. #ACNH-P088(074)E



Bid/Contract #

Contract #10-0Q2104



Awarding Agency

Caltrans



Project Location

Martell, Amador County, CA



Bid Date

10/30/2024 at 02:00



Project Details

Seeking All DBE Subcontractors/Suppliers needed for, including but not limited to: CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM/TRAFFIC FLAGGERS; HYDROSEEDING; EROSION CONTROL; TEMPORARY EROSION CONTROL; ROADSIDE SIGN; ALTERNATIVE PIPE CULVERT; CORRUGATED METAL PIPE (CSP); DOWNDRAIN; ROCK SLOPE PROTECTION; FENCING; TEMPORARY FEMCING; METAL BEAM GUARD RAILING; THERMOPLATIC TRAFFIC STRIPING & MARKING; PAVMENT MARKER; SIGNAL & LIGHTING; TRAFFIC COUNT STATION; ENVIRONMENTAL-BIOLOGICAL STUDIES; CONSTRUCTION SCHEDULING; LEAD COMPLIANCE; SWPPP PLANNING; TRUCKING; WATER TRUCK; STREET SWEEPING TRUCK; OIL ASPHALT SUPPLIER/ASPHALT OIL TANKERS; RUMBLE STRIPS; or any item of work or material you are qualified to perform or furnish. NON-DBE SUBS/SUPPLIERS: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote. Second-tier DBE participation will be evaluated with your price.



The plans and specifications may be Plans and specifications may be viewed in our office, at your local Builders Exchange or purchased through HTTPS://DOT.CA.GOV/WORK-WITH-CALTRANS

GEORGE REED, INC. is signatory to Operating Engineers, Laborers, and Cement Masons Unions. 100% Performance and Payment Bonds may be required for the full amount of subcontract price. GEORGE REED, INC. will pay bond premium up to 2%. Subcontractor must possess current insurance and workers compensation coverage meeting Owner’s and GRI’s insurance requirements. Insurance waiver of subrogation is also required. Please call if you need assistance with: bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or any related services; or assistance with breaking down items into economically feasible units or establishing flexible time frames for performance and delivery schedules to encourage or facilitate participation. George Reed, Inc. is an Equal Opportunity Employer.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.