Cassie Coppini
MARK BENZINGER
P.O. Box 1006
Eureka, CA 95502
(707) 443-6371
(707) 443-0277
WSP TRENCHLESS INSTALLATION, CSP, EROSION CONTROL
01-0H6404
CALTRANS
VARIOUS, HUMBOLDT County, CA
11/20/2024 at 14:00
LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP CRASH CUSHION MODULE, AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMP MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, TEMP CONSTRUCTION ROADWAY, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, MONITORING & REPORTING), TEMP CREEK DIVERSION SYSTEMS, CONTRACTOR-SUPPLIED BIOLOGIST, INVASIVE SPECIES CONTROL, CONTRACTOR SUPPLIED ARBORIST, TEMP HIGH-VISIBILITY FENCE, TEMP CONSTRUCTION MAT, CLEAR & GRUB, DITCH EXCAVATION, WOOD MULCH, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, FIBER ROLLS, COMPOST, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE, RAPID SETTING CONCRETE, ALTERNATIVE PIPE CULVERT, CONCRETE BACKFILL, CONCRETE COLLAR, CORRUGATED STEEL PIPE, PERFORATED STEEL PIPE UNDERDRAIN, CORRUGATED STEEL PIPE DOWNDRAIN, CABLE ANCHORAGE SYSTEM, CORRUGATED STEEL PIPE INLET, WELDED STEEL PIPE TRENCHLESS INSTALLATION METHOD, STEEL FLARED END SECTION, ABANDON CULVERT, REMOVE CULVERT, REMOVE DOWNDRAIN, REMOVE INLET, REMOVE HEADWALL, REMOVE JUNCTION BOX, REMOVE CONCRETE FLARED END SECTION, REMOVE FLARED END SECTION, CONCRETE INVERT PAVING, CULVERT SLURRY-CEMENT BACKFILL, CONCRETE (CONCRETE APRON), GRAVEL FILTER, ROCK SLOPE PROTECTION, MISC IRON & STEEL, MARKER, TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE MARKER, CABLE RAILING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.