Jocelyn Parady
James Folsom
24339 State Highway 89 North
Burney, CA 96013
(530) 335-5501
(530) 335-5510
Caltrans 02-4H0104 Hwy 70 Beckwourth
02-4H0104
Caltrans
Portola, Plumas County, CA
12/05/2024 at 02:00
Hat Creek Construction & Materials, Inc. (HCCMI) is seeking quotes from all qualified subcontractors/ suppliers including but not limited to DBE firms for the following items of work: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (LS), DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS), PORTABLE CHANGEABLE MESSAGE SIGN (LS), AUTOMATED FLAGGER ASSISTANCE DEVICE, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, SUBGRADE ENHANCEMENT GEOTEXTILE - CLASS B1, ROLLED EROSION CONTROL PRODUCT (BLANKET), HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), MINOR HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE F), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, STRUCTURAL CONCRETE- HEADWALL, CONCRETE BACKFILL (PIPE TRENCH), CONCRETE COLLAR, 18" CORRUGATED STEEL PIPE (.109" THICK), 24" CORRUGATED STEEL PIPE (.109" THICK), 30" CORRUGATED STEEL PIPE (.138" THICK), 36" CORRUGATED STEEL PIPE (.138" THICK), 24" X 18" CORRUGATED STEEL PIPE ARCH (.109" THICK), 28" X 20" CORRUGATED STEEL PIPE ARCH (.138" THICK), 42" X 29" CORRUGATED STEEL PIPE ARCH (.138" THICK), 71" X 47" CORRUGATED STEEL PIPE ARCH (.138" THICK), 36" WELDED STEEL PIPE TRENCHLESS INSTALLATION METHOD, 36" STEEL FLARED END SECTION, ABANDON CULVERT (EA), REMOVE CULVERT (EA), REMOVE PIPE (LF), REMOVE HEADWALL, REMOVED FLARED END SECTION (EA), SAND BACKFILL, MINOR CONCRETE (CURB) (CY), MINOR CONCRETE (GUTTER) (CY), DETECTABLE WARNING SURFACE, REMOVE CATTLE GUARD, 5.25' WIDE METAL CATTLE GUARD, 7.75' WIDE METAL CATTLE GUARD, PARKING BUMPER (PRECAST CONCRETE), DEER FENCE, REMOVE FENCE, DEER FENCE EXTENDER, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), MARKER (CULVERT), REMOVE ROADSIDE SIGN, REMOVE ROADSIDE SIGN PANEL, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" - FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - FRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, MIDWEST GUARDRAIL SYSTEM (8' STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), JUMPOUT, TRANSITION RAILING (TYPE AGT), ALTERNATIVE IN-LINE TERMINAL TL-3, CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), PAINTED STALL LINES AND PAVEMENT MARKINGS, REMOVE THERMOPLASTIC PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED) (BROKEN 12-3), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED) (BROKEN 18-12), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED), MODIFYING EXISTING ELECTRICAL SYSTEM, MODIFYING TRAFFIC MONITORING STATIONS, MOBILIZATION.
HCCMI is an equal opportunity employer and is willing to work with all qualified firms interested on this project. Subcontractors must possess a current contractor’s license, current PWCR, insurance coverage and worker’s compensation for the entire length of the contract. Firms are also required to comply with all In Use Off Road Diesel Vehicle regulations. If qualified firms need assistance in obtaining project plans, specifications, or requirements please contact estimating@hatcreekconstruction.com or our office at (530) 355-5501 or can also be viewed at 24339 State Highway 89 North, Burney, CA 96013. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bond may be required. Please call if you need assistance obtaining insurance, bonding, equipment, materials, and/or supplies. HCCMI intends to work cooperatively with all qualified firms seeking work on this project. We will work with any interested subcontractor/supplier to identify opportunities to break items into economically feasible packages. All DBE firms must be certified by bid date.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.