Giovanny Marquez
8432 63rd Street
Riverside, CA 92509
(951) 681-1345 ext. 236
(951) 332-0857
08-0G8504 BUILDING CONSTRUCTION IN CACTUS CITY SAFETY ROADSIDE REST AREAS
Contract No. 08-0G8504
Caltrans, District 8
Cactus City, Riverside County, CA
11/21/2024 at 02:00
EES is requesting quotes from all qualified Subcontractors including DBEs for the following items of work including but not limited to: Lead Compliance Plan , Construction Area Signs , Traffic Control System , Stationary Impact Attenuator Vehicle , Portable Delineator , Portable Radar Speed Feedback Sign System , Temporary Barrier System , Portable Changeable Message Sign , Temporary Crash Cushion , Temporary Traffic Screen , Storm water Pollution Prevention Plan , Temporary Soil Binder , Temporary Cover , Temporary Drainage Inlet Protection, Temporary Fiber Roll , Temporary Gravel Bag Berm , Temporary Construction Entrance , Street Sweeping , Temporary Concrete Washout , Treated Wood Waste , Contractor-Supplied Biologist (Ls) , Natural Resource Protection Plan , Remove Concrete (Cy) , Temporary High-Visibility Fence , Clearing And Grubbing (Ls) , Roadway Excavation , Shoulder Backing , Structure Excavation (Rock Slope Protection) , Move-In/Move-Out (Erosion Control) , Bonded Fiber Matrix (Sqft) , Class 2 Aggregate Base (Cy) , Base Bond Breaker , Tack Coat , Remove Asphalt Concrete Dike , Cold Plane Asphalt Concrete Pavement , Remove Base And Surfacing , Jointed Plain Concrete Pavement (Rsc) , Joint Seal (Preformed Compression) , Structural Concrete, Headwall , Bar Reinforcing Steel , Rapid Setting Concrete (Patch) , 57" X 38" Corrugated Steel Pipe Arch (.079" Thick) , Reset Inlet , Concreted-Rock Slope Protection (Light, 150 Lb, Class Iii, Method B) (Cy) , Rock Slope Protection Fabric (Class 8) , Temporary Desert Tortoise Fence , Delineator (Class 1) , Pavement Marker (Retroreflective-Recessed) , Marker (Culvert) , Treatment Best Management Practice Marker , Roadside Signs, Midwest Guardrail System (Steel Post) , Vegetation Control (Minor Concrete) , Cable Railing , Alternative In-Line Terminal , Buried Post End Anchor , Remove Guardrail , Traffic Stripe , Two-Component Paint Pavement Marking , 12" Rumble Strip , Maintaining Existing Traffic Management System Elements During Construction , Radar Speed Feedback Sign Systems , Modifying Signal And Lighting Systems Modifying Traffic Monitoring Stations
Project Documents can be found in the Dropbox link below.
https://www.dropbox.com/scl/fo/j05ycwpx04o4ggizr8m9i/AGF-k0IX9Cf8GEvdyMN35RA?rlkey=5p9jl7nrziokycrbkr9uthjcd&dl=0
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.