Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Haidi Daaifi



Project Estimator

Jamal Aldoaifi



Contact Information

15614 S. Atlantic Ave
Compton, CA 90221



Telephone

(310) 669-8949



Fax

(310) 693-5343



Alfaro Communications Construction, Inc
is seeking qualified DBEs, SBEss


Project Name

CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY FROM 0.1 MILE SOUTH OF ROUTE 55/1 SEPARATION IN NEWPORT BEACH TO ROUTE 55/91 SEPARATION IN ANAHEIM.



Bid/Contract #

12-0R32U4



Awarding Agency

Caltrans



Project Location

Anaheim, Tustin, Orange, Irvine, Santa Ana, Newport Beach, Costa Mesa, Orange County, CA



Bid Date

11/14/2024 at 02:00



Project Details

Alfaro Communications Construction, Inc is requesting quotes from qualified subcontractors and suppliers including certified DBE firms for the following items: CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY BARRIER SYSTEM,PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY CRASH CUSHION TL-3, TEMPORARY TRAFFIC SCREEN, STORMWATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY SILT FENCE, ASBESTOS COMPLIANCE PLAN, TEMPORARY CONSTRUCTION ENTRANCE, TREATED WOOD WASTE, ASBESTOS SURVEY AND SAMPLING, IMPORTED BORROW,ROCK BLANKET, CONCRETE GRID UNITS, RELOCATE IRRIGATION CONTROLLER, MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, WOOD MULCH, EDGING, CHECK AND TEST EXISTING IRRIGATION FACILITIES,OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS
(ARMOR-CLAD), POP-UP SPRINKLER ASSEMBLY, POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), BACKFLOW PREVENTER ENCLOSURE, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, 10" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, DOWEL BAR RETROFIT (JOINT), JOINT SEAL (MR 2"), BAR REINFORCING STEEL, FURNISH SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), REMOVE BRIDGE MOUNTED SIGN, 18" ALTERNATIVE SLOTTED PIPE, REINFORCED CONCRETE PIPE, SLOTTED CORRUGATED STEEL PIPE, GRATED LINE DRAIN, TRAFFIC STRIPE TAPE WITH CONTRAST, RUMBLE STRIP, THERMOPLASTIC TRAFFIC STRIPE, REMOVE GUARDRAIL, CONCRETE BARRIER, SEVERE-DUTY CRASH CUSHION TL-3, VEGETATION CONTROL,



The project has a 22% DBE goal. Plans and Specifications can be accessed at no cost at:
https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=12-0R32U4&sub=




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.