Cassie Coppini
Mark Benzinger
P.O. Box 1006
Eureka, CA 95502
(707) 443-6371
(707) 443-0277
Building Work
08-0G8504
Caltrans
Indio, Riverside County, CA
11/21/2024 at 02:00
LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP CRASH CUSHION, TEMP TRAFFIC SCREEN, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMP SOIL BINDER, TEMP COVER, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, ASBESTOS COMPLIANCE PLAN, REMOVE ASBESTOS CEMENT PIPE, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, REMOVE PARKING BUMPER, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, STRUCTURE BACKFILL (SLURRY CEMENT), IMPORTED BORROW, ROADSIDE CLEARING, DECORATIVE BOULDERS, ROCK MULCH, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, TRANSPLANT TREE, PLANT (GROUP A, B, K, U), PLANT ESTABLISHMENT WORK, CONCRETE PAVERS, GRAVEL MULCH, DECOMPOSED GRANITE, LOUVERED EQUIPMENT SCREEN, DECORATIVE METAL SCREEN, CANOPY PANELS, DOG WATERING STATION, CONCRETE SEATWALL, INTERPRETIVE SIGN, EDGING, BICYCLE RACK, TEMP IRRIGATION SYSTEM, CHECK & TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL & NEUTRAL CONDUCTORS, REMOTE CONTROL VALVE, STATION IRRIGATION CONTROLLER, BACKFLOW PREVENTER ASSEMBLY, FLOW SENSOR, TREE WELL SPRINKLER ASSEMBLY, RISER SPRINKLER ASSEMBLY, PLASTIC PIPE, BALL VALVE, PVC PIPE CONDUIT, CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, DOG WASTE STATION, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROMULCH, HYDROSEED, CLASS 2 AGGREGATE BASE, PRIME COAT, HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, REMOVE BASE & SURFACING, JOINTED PLAIN CONCRETE PAVEMENT, STRUCTURAL CONCRETE, MINOR CONCRETE (MINOR STRUCTURE), ENTRY MONUMENT SIGN, BAR REINFORCING STEEL, CORRUGATED STEEL PIPE, CORRUGATED STEEL PIPE INLET, STEEL FLARED END SECTION, PRECAST CONCRETE PIPE INLET, REMOVE OVERSIDE DRAIN, REMOVE CULVERT, REMOVE HEADWALL, ADJUST INLET, PARTIALLY GROUTED ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, DETECTABLE WARNING SURFACE, MINOR CONCRETE, REMOVE CONCRETE ISLAND, REMOVE CONCRETE, MISC IRON & STEEL, PAINT CURB, PARKING BUMPER, TRASH/RECYCLING RECEPTACLE, FENCE, CHAIN LINK FENCE, WIRE MESH GATE, REMOVE FENCE, TEMP DESERT TORTOISE FENCE, DESERT TORTOISE FENCE, DELINEATOR, PAVEMENT MARKER, TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE ROADSIDE SIGN, FURNISH LAMINATED PANEL SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, METAL (ROADSIDE SIGN), ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, SALVAGE GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, FIBER OPTIC CABLE SYSTEMS, MODIFYING TRUCK PARKING AVAILABILITY SIGN SYSTEM, MODIFYING LIGHTING SYSTEMS, PRECAST CONCRETE PICNIC TABLE AND BENCHES, BUILDING WORK
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.