Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Barbara Sasser



Project Estimator

Gabe Farncroft email gfarncroft@bridgewaycci.com



Contact Information

3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688



Telephone

(707) 455-7033



Fax

(707) 455-7036



Bridgeway Civil Constructors, Inc.
is seeking qualified DBEss


Project Name

Lime Creek Road over Youngs Creek Bridge Replacement



Bid/Contract #

24-1200-15-913



Awarding Agency

Calaveras County Department of Public Works



Project Location

Valley Springs, Calaveras County, CA



Bid Date

12/17/2024 at 03:00



Project Details

Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
CONSTRUCTION STAKING, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, FIBER ROLLS, PERMANENT EROSION CONTROL ESTABLISHMENT WORK, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, FUGITIVE DUST CONTROL PLAN, BAT AND BIRD EXCLUSION, DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS), SAMPLING AND ANALYSIS PLAN (NATURALLY OCCURRING ASBESTOS), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (TYPE D), STRUCTURE EXCAVATION (ROCK), STRUCTURE BACKFILL (BRIDGE), IMPORTED BORROW (CY), HYDROSEED, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) , PRESTRESSING CAST-IN-PLACE CONCRETE, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), BRIDGE REMOVAL, ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), FENCE (TYPE BW, 4-STRAND, METAL POST), REMOVE FENCE, RELOCATE GATE, OBJECT MARKER (TYPE P), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, TUBULAR BICYCLE RAILING, TRANSITION RAILING (TYPE AGT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CRASH CUSHION (QUADGUARD), CONCRETE BARRIER (TYPE 836), PAINT TRAFFIC STRIPE (2-COAT), MOBILIZATION



All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.
Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Bridgeway’s requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.