Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Estimating Department



Project Estimator

Estimating Department



Contact Information

1370 Norman Avenue
Santa Clara, CA 95054



Telephone

(408) 970-9900



Fax

(408) 213-0532



Anderson Pacific Engineering Construction, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, WOSBs, HUBZone, Section 3s, SBRA, LSAF s


Project Name

Local Advanced Water Purification System (Local AWPS)



Bid/Contract #

IFB no. 193197



Awarding Agency

City of Palo Alto



Project Location

Palo Alto, Santa Clara County, CA



Bid Date

01/31/2025 at 3:00



Project Details

Project Description: The Local AWPS project consist in two Phases. This IFB is for Phase that will produce 1.125
MGD of RO permeate and will include housekeeping pads for future skids and pipe headers sized enough to
accommodate expansion. Phase I Motor Control Centers will also accommodate for Phase II electrical loads. The
permeate produced from the project will be blended with the existing tertiary-treated recycled water to achieve an
instantaneous TDS concentration of 400 to 500 mg/L. The Local AWPS will be constructed without interruption to
the current treatment operations, except as allowed under special circumstances, such as piping and utility tie-ins.
The electrical service, potable water service and fire water supply will be independent from the RWQCP service. New
service connections will be made with City of Palo Alto Utilities (CPAU).
The Project will consist on construction of a new odor control structure, membrane filtration, reverse osmosis
system, construction of a new permeate storage tank, blending station, new chemical storage facilities, electrical,
instrumentation and control systems. Site work includes pile foundation, concrete slab, yard piping, replacement of
a sewer line, paving, grading, landscaping, construction of a metal canopy, a pre-engineered electrical building and
a perimeter wall. EE $53,598,743 M

Items for the project include, but are not limited to:
Subcontractors / Suppliers: SWPPP, site preparation, demolition, trenching, chemical storage tank, blowers, pumps, concrete, asphalt paving, concrete sidewalk curb and gutter, cast-in-place concrete, concrete repair, concrete forming, manhole and vault covers, grouting, fencing, irrigation, landscape, traffic control, traffic signs, misc. metals, metal framing, metal fabrication, structural metals, metal railings metal gratings, structural steel, rebar, fiberglass grating and railings, damproofing, protective coatings, corrosion protection system, painting & coatings, thermal and moisture protection, pre-engineered metal canopies, fire detection and alarm system, fire suppression, plumbing, piping, pipe supports, copper tubing, stainless steel pipe, PVC pipe, HDPE pipe, misc. valve, earthwork, electrical, instrumentation and controls, trucking.



Anderson Pacific Engineering Construction, Inc. is requesting subcontractor and material supply quotes from qualified and certified Disadvantaged Business Enterprise firms (includes MBE, WBE, SBE, SBRA, LSAF, & HUB). The Project may be funded in whole or part by the EPA through the California State Revolving Fund (CASRF) Clean Water and Drinking Water SRF (CWSRF) and Drinking Water State Revolving Fund (DWSRF) programs, which requires compliance with Build America, Buy America Act (BABA), Davis Bacon prevailing wage rates, and USEPA DBE compliance requirements. Please contact APEC for assistance with bonding, lines of credit, insurance, necessary equipment, supplies or materials. EOE.

Plans can be viewed at:
Anderson Pacific, 1370 Norman Ave., Santa Clara, CA 95054 by appointment or downloaded from:
https://www.dropbox.com/scl/fo/2s7q0xihammglotxskqmq/ADhronhRVxA78SffYNx6bx8?rlkey=mizm8r3uvua0jv282xm1ylj7i&st=9rnviu9n&dl=0

Submit Quotes to:
Anderson Pacific Attn: Estimating - Phone: 408-970-9900 �" Fax: 408-213-0532 �" Email: estimating@andpac.com

NOTE: *** All quotes must be per “plans and specifications,” unless otherwise noted. An EPA 4500-3 DBE Subcontractor Participation Form must be submitted with scope/quote. ***




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.