Austin Vinciguerra
Austin Vinciguerra
P.O. Box 157
Sutter Creek, CA 95685
(209) 223-3610
(209) 267-9053
Trout Avenue Waterline Replacement Project
N/A
North Tahoe Public Utility District
Kings Beach, Placer County, CA
01/23/2025 at 02:00
North Tahoe Public Utility District - Trout Avenue Waterline Replacement Project, Kings Beach, CA. The work to be performed consists of the installation of approximately 2,250 linear feet of 8-inch waterline in Trout Avenue in Kings Beach, CA. The project also includes connections to existing water mains, installation of fire hydrants, customer water services, and pavement restoration. All work is within the Placer County Right of Way. Vinciguerra Construction, Inc. is seeking quotes for all qualified subcontractors and suppliers including certified DBE, UDBE, WBE, MBE, SBE Firms for the following items of work included but not limited to: Erosion Control/Revegetation Materials furnish & placement, SWPPP, Dewatering, Waterworks Supplies & Appurtenances (Water Main Piping, Pipe Fitting’s, Gate Valves, Valve Boxes, Fire Hydrants, and Water Service Valves), Sheeting, Shoring, & Bracing, Traffic Control, Construction Area Signs, Excavation/Earth Work, Sawcutting, Asphalt Milling, Asphalt Concrete; furnish & placement, Aggregate Base; furnish & placement, Import Soil; furnish & Placement, Concrete; furnish & placement, Pavement Striping, and Trucking. Disadvantaged Business Enterprise (DBE) participation is encouraged. Plans and Specifications are available for viewing at our office or can be viewed/obtained at North Tahoe Public Utility District. Bidders may download the Contract Documents from PlanetBids using the following link: https://ntpud.org/contractor-notices ; then click “Access NTPUD PlanetBids Vendor Portal”; then click “Bid Opportunities”.
Our firm will consider dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by DBE's in the competitive process. Our company will also consider consortium of DBE's should a contract be too large for firms to handle individually. We are an Equal Opportunity Employer. 100% Performance and Payment Bonds may be required for the full amount of the subcontract price. Subcontractor's must possess a current Contractor's License and DIR registration number. Insurance and Worker's Compensation coverage meeting Vinciguerra Construction's Subcontract. Quotation must be valid for the same duration as specified for the owner for award. Please call to discuss any questions or if you should need any assistance in obtaining bonding, insurance, equipment, materials and/or supplies necessary to participate in this project.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.