Josh Cook
Stephen George
155 Howe Road
Martinez, CA 94553
(925) 228-0317
(000) 000-0000
Modesto 2024 Restroom Replacement
2025-16
City of Modesto
Modesto, Stanislaus County, CA
01/28/2025 at 11:00
EEGC is requesting bids from certified LBE Subcontractors and suppliers for trucking, WPCP, irrigation, sewer tie-in, electrical tie-in, water tie-in, sodded lawn, bollards, tree protection, landscape maintenance, and CMU masonry block wall.
The project will replace three restrooms within the City of Modesto parks; Graceada, Mark Twain, and Robertson Road. Three new prefabricated restrooms will be placed on the site of the old restrooms. The old restroom concrete pads which the old buildings sit on will be removed and replaced with new slabs. The electrical, sewer, water, and irrigation lines will likewise be upgraded to meet the new buildings requirements.
Any subcontractor performing work on the job is required to be registered with the Dept. of Industrial Relations. Please take into account when quoting the project: Prevailing Wage Rates, Certified Payroll, and Insurance Requirements.
Contact us with any assistance you may need relating to project documents, bonding, and insurance.
Please submit your quote by Close of Business on January 27, 2025.
EEGC is an equal opportunity employer.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.