Cal Poly Plant Sciences Complex & Animal Health Center
BP6A: Lab Equipment and Casework & Controlled Temperature Room BP6B: Millwork, Acoustical Ceilings, Flooring, Tile, Painting/Wall Coverings, Building Specialties (Material Only), Window Treatments & Signage
Hensel Phelps
San Luis Obispo , San Luis Obispo County, CA
02/13/2025 at 02:00
WE ARE REQUESTING QUOTATIONS FROM ALL QUALIFIED SUBCONTRACTORS INCLUDING SMALL BUSINESSES, WOMEN-OWNED SMALL BUSINESSES, VETERAN OWNED SMALL BUSINESSES, AND DISABLED VETERAN OWNED SMALL BUSINESSES FOR THE FOLLOWING SCOPES OF WORK:
BP6A: Lab Equipment and Casework & Controlled Temperature Room
BP6B: Millwork, Acoustical Ceilings, Flooring, Tile, Painting/Wall Coverings, Building Specialties (Material Only), Window Treatments & Signage
The Plant Science and Animal Health project is a public works project with a combined Project value of ~$68,000,000. It consists of two (2) separate structures on two (2) sites on the Cal Poly San Luis Obispo campus.
The Plant Sciences Building will consist of approximately 20,000 GSF (new construction) one-story laboratory building, and site improvements.
The Animal Health Center will consist of an approximately 17,000 GSF (new construction) one-story building which will accommodate instructional, clinical, support spaces, and site improvements.
Plans, specifications, and any other pertinent bidding documents will be available electronically on the Building Connected Website the week of January 20th, 2025 for BP6A and the week of January 27th, 2025 for BP6B. Contact Susan Samimi at our office number above to be added to the Building Connected solicitation for the project.
Construction for this scope will begin in September of 2025.
100% Payment and Performance Bonds are required for amounts over $100,000. Any subcontractor that cannot provide Payment and Performance Bonds for this project can contact our office at 925-494-9700 to discuss available options. Workers’ Compensation and Waiver of Subrogation will be required by all Subcontractors.