Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Spencer Roberts



Contact Information

6560 Asher Lane
Sacramento, CA 95828



Telephone

(916) 417-0692



Fax

(916) 383-7737



Flowline Contractors, Inc
is seeking qualified DBEs, MBEs, WBEss


Project Name

2025 Pioneer Trail Waterline Project



Bid/Contract #

--



Awarding Agency

South Tahoe Public Utility District



Project Location

South Lake Tahoe, El Dorado County, CA



Bid Date

02/25/2025 at 02:00



Project Details

Flowline Contractors, Incorporated is seeking quotes for Paving, Saw-Cutting, Striping, Trucking, Survey, CLSM Pipe Fill, Pipe Parts Supplier and Select Material. We are reaching out to DBE/MBE/WBE businesses. This project includes the installation of approximately 10,810 linear feet of 12-inch waterline in the Pioneer Trail right-of-way between Marshall Trail and Susquehanna Dr in South Lake Tahoe, CA. The project also includes, but not limited to, connections to existing water mains, installation of fire hydrants, abandonment of existing water facilities and pavement restoration.



For project documents, see the below Dropbox link or send an email to spencer@flowlineinc.com
Project Docs: https://www.dropbox.com/scl/fo/h0b6jg1ce80hd2hkrvekp/AAdfUpScdxMIul5DufHnY5c?rlkey=6lwidr22q8jv7jd2xomhxuyzr&dl=0




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.