Jason Muller
Jason Muller
550 Greenville Road
Livermore, CA 94550
(925) 245-1300
(925) 245-1244
Caltrans #10-1H7004 - Construct curbs ramps, sidewalks, driveways, and accessible ADA.
10-1H7004
California Department of Transportation
Angels Camps, Calaveras County, CA
02/11/2025 at 02:00
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scope of work including but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-2, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Drainage Inlet Protection, Item Description, Temporary Fiber Roll, Temporary Silt Fence, Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste) , Treated Wood Waste, Temporary High-Visibility Fence, Clearing And Grubbing , Roadway Excavation, (F) - Structure Backfill, Geosynthetic Reinforcement, Soil Amendment, Packet Fertilizer, Plant (Group A), Plant (Group U), Plant Establishment Work, Wood Mulch, Root Barrier, Control And Neutral Conductors (Armor-Clad), 3/4" Remote Control Valve, Item Description, 1" Remote Control Valve, 6 Station Irrigation Controller (Pedestal Mounted), (F) - 3/4" Copper Pipe (Supply Line), (F) - 1" Copper Pipe (Supply Line), (F) - 5/8" Drip Irrigation Tubing, 3/4" Backflow Preventer Assembly, 1" Backflow Preventer Assembly, Flow Sensor, Drip Valve Assembly, 3/4" Gate Valve, 1" Gate Valve, (F) - 3/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), Ball Valve, (F) - Pvc Pipe Conduit (Sleeve), 8" Corrugated High Density Polyethylene Pipe Conduit, Imported Topsoil (Cy), Rolled Erosion Control Product (Netting), Hydromulch, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Drainage Inlet, Pedestrian Barricade, 18" Alternative Pipe Culvert, Stress Reducing Slab, 4" Plastic Pipe Underdrain, 6" Non-Perforated Plastic Pipe Underdrain, Drainage Inlet Marker, Remove Culvert (Lf), Remove Inlet, Adjust Inlet, Adjust Frame And Cover To Grade, Cap Inlet, (F) - Small-Rock Slope Protection, Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Curb, Gutter, Sidewalk And Driveway), Minor Concrete (Stamped Concrete), Remove Concrete Curb (Lf), Remove Concrete Sidewalk (Sqyd), Remove Concrete (Curb And Gutter), Pre/Post Construction Surveys, (F) - Miscellaneous Iron And Steel, Install Bus Shelter, Reset Bus Shelter, Adjust Access Box (Utility), Adjust Manhole Frame And Cover (Utility), Paint Curb (2-Coat), Remove Pavement Marker, Pavement Marker (Retroreflective), Object Marker, Remove Roadside Sign, Remove Roadside Sign Panel, Reset Roadside Sign, Item Description, Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Install Sign (Strap And Saddle Bracket Method), Install Roadside Sign Panel On Existing Post, (F) â€" Handrailing, Remove Guardrail, Remove Metal Railing, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Green Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), "6"" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility) (Broken 8- 4)", 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Maintaining Existing Traffic Management System Elements During Construction, Rectangular Rapid Flashing Beacon Systems, Modifying Lighting Systems, Item Description, Modifying Signal And Lighting Systems, Water Meter Charges, Mobilization, and All Material Suppliers.
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Bid documents are also available on the Caltrans website at the following link: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project-calendar.php?q=10-1H7004. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.