Holly Kuchenthal
3131 Peacekeeper Way, STE 400
McClellan Park, CA 95952
(916) 546-1389
(000) 000-0000
Natomas HS Pool Renovation
24-005
Natomas Unified School District
Natomas, Sacramento County, CA
02/11/2025 at 02:00
The Natomas HS Pool Modernization project consists of pool deck replacement, pool refinishing, portable lifeguard chair, site furniture (OFCI), removal and replacement of lawn areas with synthetic turf, removal and capping irrigation system and painting all doors, door frames, downspouts and columns.
We are seeking quotes from certified DVBE Subcontractors or Material Suppliers for Erosion Control, Survey, Demolition, Caulking and Sealants, Concrete, Pools, Painting, Earthwork and Grading, Electrical, Turf, Landscaping, and Fences and Gates.
The DVBE participation requirement for the project is 3%.
--This project is subject to prevailing wage requirements--
Pricing Due: 2/11/2025 Before 2:00 pm (preferably in the morning).
Please send bids and questions to Holly at hhockett@creeksideinc.net . Holly can also be reached at 916-546-1389. Bids should be submitted the morning of 2/11/2025 to provide adequate time for review. All bid documents can be found here: https://app.buildingconnected.com/public/5cf5604be4e52b001881cdc9
Please monitor the website for addendums as they may be released.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.