Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Adam Hanson



Project Estimator

Stephen Kubat ext. 3160



Contact Information

1200 Scenic Dr., Suite 200
MODESTO, CA 95350



Telephone

(209) 523-0734



Fax

(209) 523-4927



GEORGE REED, INC.
is seeking qualified DBEss


Project Name

CONSTRUCTION ON STATE HIGHWAY IN CALAVERAS COUNTY IN AND NEAR VALLEY SPRINGS FROM 0.1 MILE EAST OF CHESTNUT STREET TO 0.1 MILE WEST OF LIME CREEK ROAD



Bid/Contract #

Contract #10-1J8204



Awarding Agency

Caltrans



Project Location

Valley Springs, Calaveras County, CA



Bid Date

02/26/2025 at 02:00



Project Details

Seeking All DBE Subcontractors/Suppliers needed for, including but not limited to: CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM | TRAFFIC FLAGGERS, TEMPORARY RAILING (TYPE K);IMPORTED BORROW;SOIL AMENDMENTS; HYDROSEEDING; EROSION CONTROL;IRRIGATION SYSTEM; TEMPORARY EROSION CONTROL; REINFORCING STEEL; ROADSIDE SIGN; CAST-IN-PLACE CONCRETE PIPE; REINFORCED CONCRETE PIPE;DOWNDRAIN; ROCK SLOPE PROTECTION; SAWCUTTING;CRASH CUSHION; THERMOPLASTIC TRAFFIC STRIPING & MARKING; PAVEMENT MARKER; SIGNAL AND LIGHTING; TRAFFICE COUNT STATION; LAND SURVEYOR/ LAND SURVERING; ENVIRONMENTALâ€" BIOLOGICAL STUDIES; LEAD COMPLIANCE; TRUCKING; LANDSCAPING CONTRACTOR; DEMOLITION; OIL ASPHALT SUPPLIER | ASPHALT OIL TANKER; RUMBLE STRIPS; or any item of work or material you are qualified to perform or furnish. NON-DBE SUBS/SUPPLIERS: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote. Second-tier DBE participation will be evaluated with your price.



The plans and specifications may be viewed in our office, at your local Builders Exchange or purchased through https://dot.ca.gov/Work-with-Caltrans

GEORGE REED, INC. is signatory to Operating Engineers, Laborers, and Cement Masons Unions. 100% Performance and Payment Bonds may be required for the full amount of subcontract price. GEORGE REED, INC. will pay bond premium up to 2%. Subcontractor must possess current insurance and workers compensation coverage meeting Owner’s and GRI’s insurance requirements. Insurance waiver of subrogation is also required. Please call if you need assistance with: bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or any related services; or assistance with breaking down items into economically feasible units or establishing flexible time frames for performance and delivery schedules to encourage or facilitate participation. George Reed, Inc. is an Equal Opportunity Employer.




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.