Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Jorge Escalona



Project Estimator

Rob Wilson



Contact Information

2185 La Mirada Dr
Vista, CA 92081



Telephone

(760) 597-9660 ext. 321



Fax

(760) 597-9661



Orion Construction Corporation
is seeking qualified DBEs, MBEs, WBEs, SBEss


Project Name

Progressive Design-Build Services for the City of Rialto Supplemental Recycled Water Supply



Bid/Contract #

RFP-JV-25-001 Project EN25022.01



Awarding Agency

Inland Empire Utilities Agency (IEUA)



Project Location

Rialto, San Bernardino County, CA



Bid Date

03/07/2025 at 02:00



Project Details

Orion Construction Corporation is seeking proposals from DBE subcontractors or consultants for Phase 1 of this project. Specific areas of interest are: Surveying, Geotechnical Investigation and Engineering, Traffic Control Engineering, and GPR Utility Locating.



Orion Construction Corporation will assist interested DBE firms in obtaining bonds, lines of credit, or insurance required by the contract documents.

Contract documents may be obtained from Orion Construction Corporation. Interested DBE firms may email estimating@orionconstruction.com to request the contract documents.






Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.