Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Haidi Daaifi



Project Estimator

Jamal Aldoaifi



Contact Information

15614 S. Atlantic Ave
Compton, CA 90221



Telephone

(310) 669-8949



Fax

(310) 693-5343



Alfaro Communications Construction, Inc
is seeking qualified DBEss


Project Name

CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS.



Bid/Contract #

07-350314



Awarding Agency

Caltrans



Project Location

Ventura, Oxnard, Camarillo, Thousand Oaks, Santa Clarita, Burbank, Santa Paula, Northridge, La Crescenta, Palmdale, Los Angeles, Ventura County, CA



Bid Date

02/13/2025 at 02:00



Project Details

Alfaro Communications Construction, Inc (ACCI) is an Equal Opportunity Contractor and we are encouraging DBE Certified Subcontractors and Suppliers to send over their quotes for the Following Bid Items: LEAD COMPLIANCE PLAN,LEVEL 2 CRITICAL PATH METHOD SCHEDULE,TIME-RELATED OVERHEAD (WDAY),DISPUTE RESOLUTION BOARD ON-SITE MEETING,HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,CHANNELIZER (SURFACE MOUNTED),PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM,TEMPORARY BARRIER SYSTEM,TEMPORARY CRASH CUSHION MODULE,TEMPORARY CRASH CUSHION TL-3,JOB SITE MANAGEMENT,WATER POLLUTION CONTROL PROGRAM,TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL,TEMPORARY CONCRETE WASHOUT,TREATED WOOD WASTE,POSITIVE LOCATION EXISTING SUBSURFACE INFRASTRUCTURE (FOR DEPTH 5' TO 10'ADD),ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), ROADSIDE CLEARING, PRUNE EXISTING PLANTS, IRON SULFATE (LB), SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP A), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK , WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES ,OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY ,CONTROL AND NEUTRAL CONDUCTORS ,1 1/2" REMOTE CONTROL VALVE, RISER SPRINKLER ASSEMBLY, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE, PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE SIGN FOUNDATION) STRUCTURAL STEEL FURNISH SIGN STRUCTURE (VERSATILE TRUSS, INSTALL SIGN STRUCTURE (VERSATILE TRUSS), MINOR CONCRETE (CURB) (LF), REMOVE CONCRETE CURB (LF), GUARD RAILING DELINEATOR, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL MAT (RUBBER OR FIBER, END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL TL-3, ALTERNATIVE CRASH CUSHION TL-3, CONCRETE BARRIER (TYPE 60M), REMOVE GUARDRAIL, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING FIBER OPTIC CABLE SYSTEMS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS, MODIFYING TRAFFIC CENSUS STATION SYSTEMS, MODIFYING COMMUNICATION SYSTEMS, MOBILIZATION



The project has a 10 % DBE goal. Plans and Specifications can be accessed at no cost at: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-350314&sub= If you are interested in this project please email us your quotes before the bid opening time to: haidi@alfarocommunications.com Phone: (310) 669-8949




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.