Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Irish Galang



Project Estimator

Jimmy Stirrat



Contact Information

17510 W. Bethany Rd
Tracy, CA 95391



Telephone

(925) 800-1848



Fax

(000) 000-0000



Garney Pacific, Inc.
is seeking qualified DBEs, MBEs, WBEs, DVBEs, SBEs, SBA MBEs, SDBs, WOSBss


Project Name

LAFAYETTE AND WALNUT CREEK WATER TREATMENT PLANTS CHEMICAL SYSTEMS SAFETY IMPROVEMENTS



Bid/Contract #

Spec 2194



Awarding Agency

East Bay Municipal Utility District



Project Location

Lafayette & Walnut Creek, Contra Consta County, CA



Bid Date

03/26/2025 at 13:30



Project Details

We are requesting bids for the following trades and /or material suppliers:
Asbestos Control Activities, Lead Hazard Control Activities, Paving Concrete Reinforcing, Cast-in-Place Concrete, Structural Steel Framing, Steel Decking,Cold-Formed Metal Framing, Metal Fabrications, Waterproofing, Roofing, Firestopping, Doors, Frames, Hardware,Gypsum Board Painting, Metal Building System, Fire Sprinklers System, Fire Detection and Alarm,Pipe & Valves, Electrical Centrifugal & Chemical Feed Pumps,HVAC,Fencing and Gates,Pipe Insulation, Plumbing,Temporary Chemical Facilities, Polyethylene & FRP Tanks.
Demo and replacement of chemical feed systems. Installation of improvements related.Installation of improvements related to chemical, worker, and environmental safety. Road Construction.



Plans are also available directly from the Construction Manager @ (510) 287-2124, or on EBMUD’s website. EBMUD’s website is:
https://construction-bids.ebmud.com/CurrentorFutureBid.aspx?BidMode=Current


Let us know if you need work items separated into smaller tasks or quantities to allow your participation. We will accommodate requests whenever possible and when economically feasible. Garney Pacific Inc. is looking for quotes for the referenced project. Garney is a union contractor, all subcontractors on the project must utilize union labor. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse Subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney Pacific unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions.

Garney Standard PO & Subcontract Forms: Standard Purchase Order and Subcontract documents can be downloaded via the link provided. These documents will be used as the basis of contracting with Garney for the above referenced project. If you have any exceptions to these documents please send redlines and comments with your quote.

Garney Pacific, Inc. is signatory to Laborers & Operators unions.




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.