Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Irish Galang



Project Estimator

Dustin Hansen



Contact Information

41619 Margarita Rd., Suite 200,
Temecula, CA 92591



Telephone

(925) 800-1848



Fax

(000) 000-0000



Garney - Tracy
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, SBA SDVOBs, SBA VOBs, WOSBs, HUBZone, Section 3s, DVBEs, Los Angeles CBEs, Pasadena LBEss


Project Name

AVENUES SEPTIC TO SEWER CONVERSION PACKAGES 1 AND 2



Bid/Contract #

Work Order #C2318



Awarding Agency

Elsinore Valley Municipal Water District



Project Location

Lake Elsinore, CA County, CA



Bid Date

04/10/2025 at 14:00



Project Details

We are requesting bids for the following trades and/or material suppliers: Asphalt - 324121 Rebar - 238120 Ready Mix Concrete - 327320 Aggregates - 423320 Trucking - 488490 Pipe Supplier - 238220, 424610 Waterworks Supplier - 221310 Trench Shoring - 238190 Hydro Vac Services - 238910 Striping - 237310 Traffic control - 561612 Landscaping - 561730 Precast Concrete - 238120 Curb and Gutter - 238160 Concrete Cutting - 238910 Rental Equipment - 532490 Septic Tank Service - 562991 Paving - 237310.

The Project consists of installing approximately 15,000 linear feet of gravity sewer to serve about 200 residences. In addition to the gravity main system design, the project includes on-site lateral installation, grinder pump installation connection to each property, and septic tank destruction



Let us know if you need work items separated into smaller tasks or quantities to allow your participation. We will accommodate requests whenever possible and when economically feasible.

Garney Pacific Inc. is looking for quotes for the below referenced project. Garney is a union contractor, all subcontractors on the project must utilize union labor. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse Subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney Pacific unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions.

Garney Standard PO & Subcontract Forms: Standard Purchase Order and Subcontract documents can be downloaded via the link below. These documents will be used as the basis of contracting with Garney for the above referenced project. If you have any exceptions to these documents please send redlines and comments with your quote.
Bid Documents are available through our website at https://www.garney.com/upcoming-bids/
Garney Pacific, Inc. is signatory to Laborers & Operators unions.




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.