Amy Roller
Mike Randall
530 Technology Drive, Suite 300
Irvine, CA 92618
(949) 333-1500
(949) 333-1510
Dominguez Pump Station Rehabilitation
Project ID No. FCC0001393
Los Angeles County Public Works, Project Management Division
Long Beach, Los Angeles County, CA
03/25/2025 at 11:00
General work description:
The scope of work of this project includes but is not limited to the following: upgrades to the major mechanical equipment, electrical equipment, and other appurtenances of the pump station. The mechanical scope involves replacement of main pumps, motors, and pipes. The electrical scope involves replacement of motor control center, pump station lighting system, as well as other electrical components. The structural scope involves modification of existing sump pump floor openings, replacement of existing catwalk in sump pump and installation of new catwalk around all five pumps in the sump area.
Scopes of work requested, but not limited to: Steel/ ductile iron pipe supply, demolition, saw cutting, clear & grub, hazardous waste removals and disposal, asbestos/ lead abatement, concrete flatwork, street sweeping, erosion control supplies, trucking, structural steel, miscellaneous metals, (sub and/or supply), FRP/ composites supply, ready mix concrete, reinforcing steel, pump supply, painting & coatings, electrical. Additional Scopes of Work may be found in the project documents.
Shimmick Construction will conduct itself in good faith with all firms participating in this project. Items of work may be broken down into economically feasible packages to encourage CBE participation. 25% CBE participation goal.
Shimmick Construction requests that Non-CBE subcontractors provide lower-tier CBE participation. Bidders are requested to indicate any lower-tier participation information so it can be evaluated as part of their quote.
For additional project information or to discuss delivery schedules, obtaining bonding, lines of credit, insurance, technical assistance, necessary equipment, supplies, and/or materials please contact the lead estimator, Mike Randall mike.randall@shimmick.com or (949) 333-1500.
Send all quotes and/or questions regarding to this project to email estimating.southwest@shimmick.com
Contract documents are available: * The contract documents, which include instructions to bidders, plans and specifications are available through the Los Angeles County Public Works Business Opportunities website: http://pw.lacounty.gov/general/contracts/opportunites or through our SmartBidNet Program: https://securecc.smartinsight.co/#/PublicBidProject/798488. If you require assistance with access to plans/specs or contract documents, please contact Amy Roller at amy.roller@shimmick.com or (949) 704-2342.
CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
Bids submitted will confirm the acceptance of the terms and conditions of SCCI’s Standard Long Form Subcontract or Purchase Order, available upon request. A Subcontractor/Supplier providing a proposed bid/price will be viewed as accepting SCCI’s Standard Long Form Subcontract or Purchase Order-100% Performance and Payment bonds are required for subcontractors; material bonds are required from all suppliers. Shimmick Construction will pay bond premium up to 2%. Subcontractors/Suppliers will be required to abide by terms and conditions of the AGC Master Labor Agreements. All proposers are bound by the prime contract terms and conditions, including payment provisions. Insurance coverage is required as set by the prime contract and/or Shimmick Construction �" whichever is greatest. Minimum insurance requirements: General Liability $1M-Per Occurrence/$2M-Agg/$2M-Completed Operations; Excess Liability $5M; Auto Liability $1M; Workers Comp & Employer Liability $1M. Project specific insurance requirements are provided in detail the Special Conditions. The listing of a Subcontractor/Supplier is not to be construed as an acceptance of all the conditions or exceptions included with the price quote. Shimmick requires that Subcontractor & Supplier price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Shimmick Construction Company, Inc. is An Equal Opportunity Employer
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.