Haidi Daaifi
Jamal Aldoaifi
15614 S. Atlantic Ave
Compton, CA 90221
(310) 669-8949
(310) 693-5343
CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN IRVINE FROM BISON AVENUE OVERCROSSING TO MACARTHUR BOULEVARD OVERCROSSING.
12-0U9104
Caltrans
Newport Beach, Irvine, Orange County, CA
04/09/2025 at 02:00
Alfaro Communications Construction, Inc (ACCI) is an Equal Opportunity Contractor and we are encouraging DBE Certified Subcontractors and Suppliers to send over their quotes for the Following Bid Items: LEAD COMPLIANCE PLAN,TIME-RELATED OVERHEAD (WDAY),CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,TEMPORARY TRAFFIC STRIPE (PAINT),CHANNELIZER (SURFACE MOUNTED),TEMPORARY PAVEMENT MARKER,TEMPORARY BARRIER SYSTEM,PORTABLE CHANGEABLE MESSAGE SIGN (LS),TEMPORARY CRASH CUSHION TL-3,TEMPORARY TRAFFIC SCREEN,JOB SITE MANAGEMENT,WATER POLLUTION CONTROL PROGRAM,TEMPORARY DRAINAGE INLET PROTECTION,TREATED WOOD WASTE,REMOVE CONCRETE (SQYD),TEMPORARY HIGH-VISIBILITY FENCE,CLEARING AND GRUBBING (LS),ROADWAY EXCAVATION,IMPORTED BORROW (CY),BONDED FIBER MATRIX (SQFT),HOT MIX ASPHALT (TYPE A)PLACE HOT MIX ASPHALT DIKE (TYPE E),REMOVE ASPHALT CONCRETE DIKE,(F) - STRUCTURAL CONCRETE, DRAINAGE INLET,(F) - MINOR CONCRETE (MINOR STRUCTURE),36" REINFORCED CONCRETE PIPE,REMOVE HEADWALL,REMOVE CONCRETE (CHANNEL),MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION),FRAME AND GRATE,SEVERE-DUTY CRASH CUSHION TL-3,CONCRETE BARRIER (TYPE 60MS),CONCRETE BARRIER TRANSITION,REMOVE GUARDRAIL,MOBILIZATION
The project has a 21% DBE goal. Plans and Specifications can be accessed at no cost at: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=12-0U9104&sub= If you are interested in this project please email us your quotes before the bid opening time to: haidi@alfarocommunications.com Phone: (310) 669-8949
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.