Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Haidi Daaifi



Project Estimator

Jamal Aldoaifi



Contact Information

15614 S. Atlantic Ave
Compton, CA 90221



Telephone

(310) 669-8949



Fax

(310) 693-5343



Alfaro Communications Construction, Inc
is seeking qualified DBEss


Project Name

CONSTRUCTION ON STATE HIGHWAY IN PLACER AND NEVADA COUNTIES FROM 0.3 MILE EAST OF DRUM FOREBAY OVERCROSSING TO 0.2 MILE EAST OF TROY UNDERCROSSING.



Bid/Contract #

03-0J5604



Awarding Agency

Caltrans



Project Location

Blue Canyon, Emigrant Gap, Carpenter Flat, Yuba Gap, Yuba Pass, Cisco Grove, Rainbow Big Bend , Placer, Nevada County, CA



Bid Date

04/03/2025 at 02:00



Project Details

Alfaro Communications Construction, Inc (ACCI) is an Equal Opportunity Contractor and we are encouraging DBE Certified Subcontractors and Suppliers to send over their quotes for the Following Bid Items: LEAD COMPLIANCE PLAN,TIME-RELATED OVERHEAD (LS),DISPUTE RESOLUTION BOARD ON-SITE MEETING,HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS,CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,TYPE III BARRICADE,TEMPORARY PAVEMENT MARKING (PAINT),TEMPORARY TRAFFIC STRIPE (PAINT),TRAFFIC DRUM,TEMPORARY BARRIER SYSTEM,PORTABLE CHANGEABLE MESSAGE SIGN (LS),TEMPORARY CRASH CUSHION TL-3,AUTOMATED FLAGGER ASSISTANCE DEVICE DAY,JOB SITE MANAGEMENT,WATER POLLUTION CONTROL PROGRAM,TEMPORARY CHECK DAM,TEMPORARY DRAINAGE INLET PROTECTION,TEMPORARY FIBER ROLL,TEMPORARY GRAVEL BAG BERM,STREET SWEEPING,TEMPORARY CONCRETE WASHOUT,TREATED WOOD WASTE,CONTRACTOR-SUPPLIED BIOLOGIST (LS),CLEARING AND GRUBBING (ACRE),ROADWAY EXCAVATION ,IMPORTED BORROW (CY),MOVE-IN/MOVE-OUT (EROSION CONTROL),BONDED FIBER MATRIX (SQFT),ROLLED EROSION CONTROL PRODUCT(BLANKET),FIBER ROLLS ,COMPOST (CY),CLASS 4 AGGREGATE SUBBASE,CLASS 2 AGGREGATE BASE (CY) ,HOT MIX ASPHALT (TYPE A),REMOVE ASPHALT CONCRETE PAVEMENT (CY) ,JOINTED PLAIN CONCRETE PAVEMENT,DRILL AND BOND (DOWEL BAR) ,JOINT SEAL (ASPHALT RUBBER),REMOVE CONCRETE PAVEMENT (CY),(F) - STRUCTURAL CONCRETE, DRAINAGE INLET,24" REINFORCED CONCRETE PIPE ,30" REINFORCED CONCRETE PIPE,36" REINFORCED CONCRETE PIPE ,42" REINFORCED CONCRETE PIPE,24" CORRUGATED STEEL PIPE (.109" THICK) ,24" WELDED STEEL PIPE (.250" THICK),36" WELDED STEEL PIPE (.250" THICK) ,24" STEEL FLARED END SECTION,36" STEEL FLARED END SECTION ,48" STEEL FLARED END SECTION,24" CONCRETE FLARED END SECTION ,30" CONCRETE FLARED END SECTION,36" CONCRETE FLARED END SECTION ,42" CONCRETE FLARED END SECTION,ABANDON CULVERT (LF),REMOVE CULVERT (LF) ,REMOVE INLET,REMOVE FLARED END SECTION (EA),CLEANING, INSPECTING, AND PREPARING CULVERT (LF),CONCRETE INVERT PAVING,SAND BACKFILL,ROCK SLOPE PROTECTION (3/8 T, CLASS VI,METHOD B) (CY),ROCK SLOPE PROTECTION (1/4 T,CLASS V,METHOD B) (CY),ROCK SLOPE PROTECTION (300 LB, CLASS IV,METHOD B) (CY) ,ROCK SLOPE PROTECTION (150 LB, CLASS III,METHOD B) (CY),ROCK SLOPE PROTECTION (60 LB, CLASS II,METHOD B) (CY),ROCK SLOPE PROTECTION (20 LB, CLASS I,METHOD B) (CY),ROCK SLOPE PROTECTION (1/2 T, CLASS VII,METHOD B) (CY) ,ROCK SLOPE PROTECTION FABRIC (CLASS 8),(F) - MISCELLANEOUS IRON AND STEEL ,MIDWEST GUARDRAIL SYSTEM (STEEL POST),VEGETATION CONTROL (MINOR CONCRETE),END ANCHOR ASSEMBLY (TYPE SFT-M),ALTERNATIVE IN-LINE TERMINAL TL-3,REMOVE GUARDRAIL,REMOVE (THERMOPLASTIC OR PAINTED) TRAFFIC STRIPE (HIGH PRESSURE WATER BLASTING),6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED),6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED, BROKEN 36-12),CONTRAST STRIPE PAINT (2-COAT),ROADSIDE WEATHER INFORMATION SYSTEM,VARIABLE MESSAGE SIGN SYSTEM,CAMERA SYSTEMS ,REMOVING CLOSED CIRCUIT TELEVISION SYSTEM,MODIFYING AUTOMATIC VEHICLE CLASSIFICATION SYSTEM,MODIFYING TRAFFIC MONITORING STATIONS ,REMOVE ROADSIDE WEATHER INFORMATION SYSTEM,REMOVING EXTINGUISHABLE MESSAGE SIGN SYSTEMS,MOBILIZATION



The project has a 21% DBE goal. Plans and Specifications can be accessed at no cost at: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=03-0J5604&sub= If you are interested in this project please email us your quotes before the bid opening time to: haidi@alfarocommunications.com Phone: (310) 669-8949
Date posted: 03/07/2025




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.