Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Mike Wiebelhaus



Project Estimator

Mike Wiebelhaus



Contact Information

22099 Palo Way
Palo Cedro, CA 96073



Telephone

(530) 547-1112



Fax

(530) 547-1118



Allen Gill Construction Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEss


Project Name

Centimudi Water Storage Tank



Bid/Contract #

Bid No. 2024-04



Awarding Agency

City of Shasta Lake



Project Location

Shasta lake, Shasta County, CA



Bid Date

04/10/2025 at 02:00



Project Details

Allen Gill Construction Inc. is seeking quotes from all certified MBE and WBE Subcontracts, vendors and material providers for the following items of work, but not limited to: Concrete, aggregate, water storage tan k, water material and appurtenances, asphalt, fencing, trenching, trucking, site work, traffic control, WPCP, construction staking, shoring, landscaping and irrigation, and site electrical and mechanical. Scope of work: construct a new 2.45-million-gallon reinforced prestressed concrete finished water storage tank & associated work including but not limited to site preparation, earthwork, trenching, installation of related piping & appurtenances, asphalt paving, security fence and landscaping. Participation Goal: 6.8% MBE and 6.9% WBE



Allen Gill Construction Inc. is available to discuss breaking out any portion of work to encourage MBE and WBE participation. We can be reached at the office (530) 547-1112 and are available to provide you with any assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds as well as, technical assistance. Plans, specifications and project requirements may be reviewed at our office in Palo Cedro, CA. They can also be viewed and downloaded online at Virtual Bid: http://www.virtual-bid.com/bids-search/01jba093bnwsjsp3sefbh4z7kd. Wage Requirements: This is a public works project, and the Contractor shall be required to comply fully with all Laws and Regulations of the State of California DIR regarding Labor Standards and the payment of prevailing wages on Public Works. In addition, this project is also required Federal prevailing wage, Davis Bacon. In case of conflict between the Federal and State Wage rates, the higher rates must be paid. Bidders are responsible to inform themselves as to current and applicable wage rates, and as to any pending changes or adjustments of such rates. Each subcontractor must submit proof of current DIR Registration when submitting a quote. Each subcontractor is required to comply with California Air Resources Board (CARB) regulation related to In-Use-Off-Road Diesel-Fueled Fleets, at the time of submitting a proposal. Requirements: by submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Certification: Under the MBE/WBE Program, entities can no longer self-certify, and contractors and sub-contractors must be certified at bid opening. Contractors and subcontractors must provide MBE/WBE certification approved per the specifications of this project.




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.