Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Haidi Daaifi



Project Estimator

Jamal Aldoaifi



Contact Information

15614 S. Atlantic Ave
Compton, CA 90221



Telephone

(310) 669-8949



Fax

(310) 693-5343



Alfaro Communications Construction, Inc
is seeking qualified SBEss


Project Name

CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING IN SAN JUAN CAPISTRANO TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING IN LAKE FOREST.



Bid/Contract #

12-0K0244



Awarding Agency

Caltrans



Project Location

Laguna Woods, Lake Forest, Mission Viejo, Laguna Hills, Laguna Niguel, San Juan Capistrano , Orange County, CA



Bid Date

04/10/2025 at 02:00



Project Details

Alfaro Communications Construction, Inc (ACCI) is an Equal Opportunity Contractor and we are encouraging SBE Certified Subcontractors and Suppliers to send over their quotes for the Following Bid Items: LEAD COMPLIANCE PLAN,TIME-RELATED OVERHEAD (WDAY),DISPUTE RESOLUTION BOARD ON-SITE MEETING,HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD- RELATED TASKS,CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,JOB SITE MANAGEMENT,WATER POLLUTION CONTROL PROGRAM,ROADSIDE CLEARING,PRUNE EXISTING PLANTS,WEED GERMINATION,SOIL AMENDMENT,PACKET FERTILIZER,PLANT (GROUP F),PLANT (GROUP H),PLANT (GROUP A),PLANT (GROUP B),PLANT (GROUP U),MAINTAIN EXISTING PLANTED AREAS,PLANT ESTABLISHMENT WORK,GRAVEL MULCH,WOOD MULCH,CHECK AND TEST EXISTING IRRIGATION FACILITIES,OPERATE EXISTING IRRIGATION FACILITIES,REMOVE IRRIGATION FACILITY,CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD),1" REMOTE CONTROL VALVE,1 1/2" REMOTE CONTROL VALVE,2" REMOTE CONTROL VALVE,30-42 STATION IRRIGATION CONTROLLER (WALL MOUNTED),RECYCLED WATER IDENTIFICATION AND WARNING SIGNS,TREE WELL SPRINKLER ASSEMBLY,RISER SPRINKLER ASSEMBLY (GEAR DRIVEN),POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN),RISER SPRINKLER ASSEMBLY,(F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),(F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),(F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),(F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE),BALL VALVE,CLASS 2 AGGREGATE BASE (CY),MOBILIZATION



The project has a 5% SBE goal. Plans and Specifications can be accessed at no cost at: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=12-0K0244&sub= If you are interested in this project please email us your quotes before the bid opening time to: haidi@alfarocommunications.com Phone: (310) 669-8949




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.