Audrey Schultz
Dave Farkas
1700 Swift Street
North Kansas City, MO 64116
(816) 741-4600
(816) 278-5912
Middle Big Creek WWTF Phase 2 Expansion
10-2436-0325
Little Blue Valley Sewer District
Pleasant Hill, Cass County, MO
05/13/2025 at 02:00
Scopes include, but are not limited to: Materials Testing, Demolition, Concrete Sawcutting, Earthwork, Erosion and Sediment Control, Chain Link Fencing, Seeding, Concrete Repair, Concrete Forming, Concrete Placing, Precast Concrete, Rebar Installation, Concrete Paving, Masonry, Waterproofing, Roofing, Joint Sealants, Building Insulation, FRP Doors and Frames, Aluminum Overhead Doors, Aluminum Windows, Skylights, Glass and Glazing, Coatings, Protective Systems for Concrete Surfaces, Metal Building Systems, Plumbing, HVAC, Electrical, Instrumentation, Bridge Cranes, and Hoists, Trolleys, and Monorails.
Participation goals for this project are: 12.7% MBE and 6.9% WBE.
If you are able to receive bid documents electronically, they are available for download on Garney's Online Plan Room - https://app.buildingconnected.com/public/547f7bd4e3bfa10500b559ad/projects/67e5c16f9176e20030cf2c79
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.