Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Estimating Department



Project Estimator

Estimating Department



Contact Information

1370 Norman Avenue
Santa Clara, CA 95054



Telephone

(408) 970-9900



Fax

(408) 213-0532



Anderson Pacific Engineering Construction, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, SBA SDVOBs, SBA VOBs, WOSBs, DVBEss


Project Name

Main Wastewater Treatment Plant Oxygen Plant Rehabilitation (Rebid)



Bid/Contract #

SD-428A



Awarding Agency

East Bay Municipal Utility District



Project Location

Oakland, Alameda County, CA



Bid Date

05/14/2025 at 1:30



Project Details

Project Description:
Work includes demolition and replacement of motors, valves, instruments, controls, and other appurtenances associated with the cryogenic oxygen production facility at East Bay Municipal Utility District's Main Wastewater Treatment Plant (MWWTP). Existing pneumatic controls will be replaced with new electronic instruments and controls. The work also includes re-coating of existing steel cold boxes, new controls, integration of controls into the MWWTP's distributed controls system (DCS), fire protection, fall protection, seismic retrofit of panels, and all materials, equipment, services, and construction inherent to the Work. EE $9.6-$11.7 million.

Major items for the project include:
Subcontractors / Suppliers: demolition, lead removal, rebar, cast-in-place concrete, concrete repair, anchor systems, hot-dip galvanizing, welding and brazing, steel framing, metal fabrication, perlite insulation, thermal protection, moisture protection, painting and coatings, fire suppression, fire sprinkler system, fire alarm, plumbing, piping, fitting/valves, air compressor motor, electrical/instrumentation, optical fiber, and trucking.



Anderson Pacific Engineering Construction, Inc. is requesting subcontractor and material supply quotes from qualified and certified White Men-Owned Businesses, White Women-Owned Businesses, & Ethnic Minority-Owned Businesses to meet the project participation goals. All firms are encouraged to participate. Subcontractors need to be aware that this project requires Davis-Bacon and State of California prevailing wage rates. Bonding, lines of credit, and special insurance limits may be required; please contact APEC for assistance. EOE.

Plans can be viewed at:
Anderson Pacific, 1370 Norman Ave., Santa Clara, CA 95054 by appointment or downloaded from:
https://construction-bids.ebmud.com/SpecMain.aspx?SpecGN=9308&BidMode=Current

Submit Quotes to:
Anderson Pacific 1370 Norman Ave., Santa Clara, CA 95054 ATTN: Good Faith Effort Department
Phone: 408-970-9900 " Fax: 408-213-0532 " Email: estimating@andpac.com

NOTE: *** All quotes must be per “plans and specifications,” unless otherwise noted. ***




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.