Jamie Miranda
Tom Rossman
1 Harbor Center, Suite 200
Suisun City, CA 94585
(707) 410-5070
(510) 777-5099
RapidRide I Line Bus Rapid Transit Improvements
KC001396
King County
Renton, Auburn, Kent, King County County, WA
05/08/2025 at 01:30
The Work under this Contract includes improvements to King County Metro Route 160 by installing RapidRide Stations in the jurisdictions of the City of Renton, City of Kent, and City of Auburn. The Work also includes modifications of roadways, signals, utilities, and channelization to facilitate bus movements as further defined in the Contract Documents.
SBE/DBE Requirement: 20%
Shimmick Construction Company, Inc. welcomes quotes from certified subcontractors and suppliers on complete or partial portions of work, including (but not limited to) the following:
Site Preparation/Excavation; Surveying; Drainage; Grading; Channelization/Signing; Illumination/Electrical/Signal/ITS; Landscaping; Concrete; Paving; Traffic Control; Utilities; and Kit-of-Parts Stations
Plans and specifications are available via King County’s Supplier Portal: https://fa-epvh-saasfaprod1.fa.ocs.oraclecloud.com/fscmUI/faces/FuseWelcome?_afrRedirect=31404957598429073&_adf.ctrl-state=8tcw0k8zv_217&_afrLoop=31404958043242711 as well as BuildingConnected: https://app.buildingconnected.com/public/54eca93614476f080018958b/projects/67fe8c48dd8686004b7949bf
You may contact Jamie Miranda at jmiranda@shimmick.com to set up a meeting via Teams to discuss the plans with an estimator. Meetings are held during regular business hours of 8am to 5pm.
100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.
This contract is funded, in part, by the U.S. Department of Transportation, Federal Transportation Administration and is subject to the requirements set forth in Grant WSDOT Construction Grant Agreement No. PTD0171, WSDOT Regional Mobility Grant No.
PTD0411, WSDOT Move Ahead Washington Tier Grant No. PTD0787, FTA Grant No. WA-2024-047-00,FTA Grant No. WA-2024-056-00, FTA Grant No. WA-2024-065-00, and FTA Grant No. WA-2025-001-00 and incorporated by reference as if fully set forth herein.
Additional Compliance to Federal Requirements include (but not limited to):
Buy America, Federal Small Business Enterprise Program, Davis-Bacon Act
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.