Construct 6 Unit T-Hangar with 56’ x 62’ Box Hangar(s) Project at Hancock Co Airport
AIP Project No: 3-21-0023-0XX-2025
Hancock County Airport Board
Lewisport, Hancock County, KY
05/02/2025 at 03:00
We are seeking quotes for the following items:
2 M-100-5.1 6 Each Low Profile Barricades (to remain airport property)
3 M-200-10.1 1 LS 6 Unit T-hangar Building, Complete in Place
4 M-200-10.2 1 LS T-Hangar Building Electrical Service
5 KY-201-3.1 1 LS Construction Staking
6 KY-214-3.1 18820 SYD Fabric-Geotextile Class 2
7 KY-400-3.1 770 Ton Asphalt Base Course (CL2 0.75D PG64-22)
8 KY-400-3.2 515 Ton Asphalt Surface Course (CL2 0.38D PG64-22)
9 KY-406-3.1 430 Gal. Asphalt Tack Coat
10 PST-103-5.1 1 LS Proposed Stub-outs for Future Utilities
11 PST-115-3.1 1 LS Fence Removal
12 PST-118-3.1 2 Each Electrical Junction Box
13 PST-300-5.1 1 LS Lockout/Tagout
14 P-152-4.1 1492 C.Y. Unclassified Excavation
15 P-152-4.2 127 C.Y. Embankment in Place
16 P-152-4.3 9410 SYD Shot Rock Fill (24" deep)
17 P-156-5.1 1760 L.F. Temporary Silt Fence
18 P-156-5.2 1 Each Silt Trap Type B
19 P-209-5.1 1560 Ton Crushed Aggregate Base Course
20 P-620-5.1 1000 S.F. Pavement Marking, Yellow
21 P-620-5.2 1000 S.F. Pavement Marking, Black
22 D-701-5.1 44 L.F. 24" Corrugated Metal Pipe
23 D-752-5.1 2 Each 24" Sloped and Flared Box Inlet with Grate
24 F-162-5.1 619 L.F. 7' Chain Link Fence with Barbed Wire
25 T-901-5.1 2.2 Acre Seeding and Mulching
26 L-108-5.1 310 L.F. Cable Trench
27 L-108-5.2 340 L.F. No. 8, 1/C, L-824, 5kV Wire
28 L-110-5.1 80 L.F. 2-Way Concrete Encased Electrical Duct
29 L-110-5.2 230 L.F. 3" Schedule 40 PVC Electrical Conduit
The DBE goal is 7.2%.
Plans/Specs are available upon request.