Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Gerardo Campos



Project Estimator

christina monreal



Contact Information

3003 N. Monore Ave
Fresno, CA 93722, CA 93723



Telephone

(559) 388-8698



Fax

(000) 000-0000



GCB1 Inc.dba GC Builders
is seeking qualified DVBEss


Project Name

Edison High School Locker Room Modernization



Bid/Contract #

No. 25-40



Awarding Agency

Fresno Unified School District



Project Location

Fresno, Fresno County, CA



Bid Date

04/30/2025 at 01:00



Project Details

DIVISION 02 �" EXISTING CONDITIONS
02 26 00 HAZARDOUS MATERIALS PROCEDURES
02 41 19 SELECTIVE DEMOLITION
DIVISION 03 �" CONCRETE
03 11 01 CONCRETE FORMWORK
03 15 14 DRILLED ANCHORS
03 20 00 REINFORCEMENT
03 30 00 CAST-IN-PLACE CONCRETE
03 35 10 POLISHED CONCRETE FINISHING
DIVISION 05 – METALS
05 12 00 STEEL AND FABRICATIONS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 17 13 COMPOSITE LUMBER
06 41 23 MODULAR CASEWORK
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 18 50 VAPOR-ALKALINITY CONTROL
07 21 00 INSULATION
07 40 00 METAL PANELS
07 51 13 COLD PROCESS BUILT-UP ROOFING V 2020.01
07 60 00 SHEET METAL
07 72 00 ROOF ACCESSORIES
07 92 00 SEALANTS
07 95 00 EXPANSION JOINTS
DIVISION 08 – OPENINGS
08 11 00 METAL DOORS AND FRAMES
08 70 00 HARDWARE
08 70 00.1 HARDWARE SCHEDULE
08 80 00 GLASS
08 91 00 LOUVERS
DIVISION 09 – FINISHES
09 22 16 METAL FRAMING .
09 24 00 CEMENT PLASTER ...
09 29 00 GYPSUM BOARD ..
09 30 00 TILE ..
09 50 00 ACOUSTICAL CEILINGS ...
09 65 10 RESILIENT BASE AND ACCESSORIES .......
09 65 16 RESILIENT SHEET ....
09 67 23 RESINOUS FLOORING ..
09 72 00 WALL COVERINGS
09 91 00 PAINTING
DIVISION 10 – SPECIALTIES
10 11 00 VISUAL DISPLAY BOARDS ..
10 14 00 IDENTIFYING DEVICES
10 21 13 TOILET PARTITIONS ....
10 28 13 TOILET ACCESSORIES ...
10 44 00 FIRE PROTECTION SPECIALTIES ...
10 51 13 METAL LOCKERS
DIVISION 14 – CONVEYING EQUIPMENT
14 42 00 WHEELCHAIR LIFTS
DIVISION 21 – FIRE SUPPRESSION
21 00 00 FIRE SPRINKLER SYSTEM...
DIVISION 22 – PLUMBING
22 00 00 PLUMBING
DIVISION 23 –HEATING VENTILATING AND AIR CONDITIONING
23 00 00 GENERAL MECHANICAL PROVISIONS .
23 00 01 HEATING, VENTILATING AND AIR CONDITIONING .
23 09 23 BUILDING AUTOMATION SYSTEMS (BAS) .
23 09 24 BUILDING AUTOMATION SYSTEM ADDITIONAL REQUIREMENTS
DIVISION 26 – ELECTRICAL
26 00 00 BASIC ELECTRICAL REQUIREMENTS .
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL .
26 05 26 GROUNDING ....
26 05 53 ELECTRICAL IDENTIFICATION ...
26 24 16 PANELBOARDS .....
26 50 00 LIGHTING
DIVISION 27 – COMMUNICATIONS
27 20 00 DATA CABLING AND EQUIPMENT ..
27 51 00 PUBLIC ADDRESS AND CLOCK SYSTEMS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 16 00 INTRUSION DETECTION ........
28 20 00 ELECTRONIC SURVEILLANCE ........
28 31 00 FIRE DETECTION AND ALARM
APPENDICES
APPENDIX "A" – NOT USED
APPENDIX "B" – INTERIOR COLOR SCHEDULE .
APPENDIX "C" – EXTERIOR COLOR SCHEDULE





You can find all bid requirements on the Central California Builders
Exchange. If you are not part of the exchange, you can email us at
christina@gc-builders.com for all bid requirements.




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.