Buena Vista Horace Mann K-8 Modernization Lease-Leaseback GMP Bid
11959
San Francisco Unified School District
San Francisco, San Francisco County, CA
05/23/2025 at 02:00
Scope: Full modernization of building systems, hazmat abatement, seismic improvements to existing shear walls, new exterior windows, roofing & (E) exterior finish repair, interior construction and finishes, accessibility improvements of new bathrooms on every level, and replacement of majority of the fire sprinkler system components in all buildings, and site work.
Please break out Alternates 1-5 on your bid scope.
There are 3 General Contractors who are shortlisted to bid on this project so there may be 3 different bid dates to each GC.
If you want us to use your number, please send to us at Alten's specified date/time above.
There is a Project Labor Agreement (PLA) on this project!
Prevailing Wage & Weekly Certified Payroll Reports on LCP Tracker
Skilled & Trained Workforce Requirements - Refer to PLA
See Owner Contract Extracts for Insurance Requirements to Include in your bid
5% Retention
RFI Deadline is 5/5/25 by 2PM (to SFUSD, so please get to us at least 1 hour prior to that if not sooner)
MEP+FS Subs MUST submit Prequalifications to SFUSD at least 10 Business Days prior to 5/19/25
Duration Dates 6/25/25 to 3/31/28 SC & 4/30/28 FC - See Milestone Schedule in Exhibit D-1 Special Conditions
$6,000 per Calendar Day (past beneficial occupancy date) * $3,000 per Cal. Day for Final Completion - Liquidated Damages
Non-Mandatory for Subs / Highly Recommended Site Walk 4/25 @ 8 AM
Refer to "Owner Contract Extracts for Sub Bids" folder on Building Connected for additional bid documentation to include in your bid
2-Year General Warranty (refer to your spec section for
other potentially longer warranties)
New as of 1/1/24: New California Air Resource Board or C.A.R.B. requirements apply to all subcontractors with equipment on-site. current certificates of compliance from the Air Resource Board's D.O.O.R.S. website and compliant equipment on-site will be required/collected/and monitored at all times by Alten on-site staff.
Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to include CSLB license # & DIR # on bid sub list - make sure to put them on your bid scope's 1st page!
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project, but you are required to include the cost for all required insurance in your bid.
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website www.altenconstruction.com or requesting from our bid coordinator Karin Romeo at kromeo@altenconstruction.com.
TRADES NEEDED (but not limited to): HazMat Abatement; Demolition; Earthwork; Grading; Site Prep; Trenching, Backfilling & Compacting; Site Water/Sanitary Sewer/Storm Drainage/Subdrainage/Bioretention; Asphalt & Concrete Paving; Pervious Concrete; Joint Sealants, Permeable Unit Pavers; Pavement Markings; Athletic Field Surfacing; Maint. of Concrete; Underslab Vapor Retarder; Concrete Reinforcing; CIP Concrete; Concrete Finishing; Concrete Floor Finishes; Shotcrete; Glass FRC Column Covers; Externally Bonded FRP; Structural Steel Framing; Steel Decking; Ext. Light Metal Stud Framing; Metal Fab/Stairs/Ladders/Pipe & Tube Railings; Decorative Metal; Rough & Finish Carpentry; Wood Decking; Arch. Wood Casework; FRP; Waterproofing; Insulation; Air Barriers; Asphalt Shingles; Clay Roof Tiles; TPO Membrane Roofing; Sheet Metal Flashing & Trim; Roof Accessories & Pavers; Firestopping; Joint Sealants; Exp. Joint Covers; Wood Window Restoration; Doors, Frames & Hardware; Access Doors & Panels; Entrances & Storefronts; Curtainwall; Alum. Windows; Unit Skylights; Polycarbonate Canopies; Glazing; Louvers; Repair of Plaster; Wood Floor Refinishing; Floor Prep; Gypsum Board; Metal Suspension Systems; Cement Plaster; Tiling; Acoustical Ceilings and Wall Panels;
Resilient Flooring & Base; Resinous Epoxy Flooring; Wall Coverings; Painting & Coatings; Visual Display Units; Signage; Toilet Compartments & Accessories; Wall & Door Protection; Fire Protection Specialties; Metal Lockers & Storage Shelving; Bird Control; Appliances; Food Service Equipment; Kilns; Stage Curtains & Window Drapery; Gymnasium Equipment; Playground Equipment; Athletic Equipment; Facility Fall Protection; Countertops; Entrance Floor Mats & Frames; Exterior Acoustic Roof Screen; Hydraulic Elevator Modifications; Scissor Lift Table; Fire Suppression Sprinklers; Plumbing; HVAC; Integrated Automation; Electrical; Communications; Electronic Safety & Security.
Plans & Specifications are available for review and take-off in our office & free download on Building Connected.
Estimator & Building Connected Plan Room Access: Bobby Alten x47 / Bid Coordinator: Karin Romeo x26 /
Chief Estimator: Erik Andresen x15
Phone: 1-510-234-4200 Email: bids@altenconstruction.com
Fax: (Dial 1 + Area Code even from a 510 number) 1-510-234-4221
In order for bids to be considered, they must be received at our office by email, mail, phone or fax one half hour prior to bid closing time.
INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED)
100% PERFORMANCE & PAYMENT SUB BONDS MAY BE REQUIRED.
ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM.
PLEASE RESPOND TO EMAILED BUILDING CONNECTED INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.
TO REQUEST ACCESS TO BUILDING CONNECTED (A FREE SERVICE), EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.
ALTEN CONSTRUCTION, LLC IS AN EQUAL OPPORTUNITY EMPLOYER
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS
NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT:
A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING;
B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN'S DUTIES, TO BIDDER'S DUTIES TO ALTEN; AND
C) THAT UPON ALTEN'S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN'S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.