Nora Pineux
Arsenio Marcelo
5200 Franklin Drive #115
Pleasanton, CA 94588
(925) 621-5700
(000) 000-0000
State Route 82 CMGC
04-0K81U4 CMGC
Department of Transportation (Caltrans)
San Mateo, San Mateo County, CA
07/10/2025 at 2:00
Request for qualified bids from Subcontractors, Suppliers, and Truckers for the following project:
PROJECT: Contract No. 04-0K81U4 CMGC - Construction on State Route 82 in San Mateo County from PM 12.3 In San Mateo, CA to PM 15.9 in Millbrae, CA
ESTIMATE: $120,000,000
DURATION: 1000 Working Days
DBE Goal: 23%
OWNER: Department of Transportation (CALTRANS)
BID DUE DATE: July 10, 2025, at 2:00 PM
Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials and equipment for Aggregate Base, Aggregate Sub Base, Alternative Pipe Culvert, Asbestos Removal/Abatement, Asphalt Concrete, Asphalt Oil Tankers, Asphalt Supplier (Bulk Item), Bottom Dump Truck, Clearing & Grubbing, Concrete Curb & Sidewalk- Misc, Construction Area Signs, Construction Engineering & Inspection Services, Construction Scheduling, Consultant, Environmental, Coring, Corrugated Metal Pipe (CSP), Crack Monitoring, Cutting, Demolition, Detector, Drainage Systems Supplier, Electrical, Electrical & Signals Supplier, End Dump Truck, Engineering- Geotechnical, Environmental - Biological Studies, Environmental - Water Quality , Erosion Control, Finishing Roadway, Flat Bed Trucking, Grading, Hazardous Substance Removal, Hazardous Waste Trucking, Heavy Equipment Rental, Highway Planting, Irrigation System, Land Surveying, Land Surveyor, Landscaping & Nursery Supplier, Landscaping Contractor, Landscaping Materials Supplier, Lead Compliance, Lighting, Material Testing Services, Message Signs, Lighting & Sign Illumination, Metal Beam Guard Railing, Minor Concrete Structure, Misc Iron & Steel Frame, Cover & Grate, Object Marker, Painted Traffic Striping & Marking, Pavement Markers Supplier, Pavement Marking, Pavement Reinforcing Fabric, Paving Asphalt (Asphalt Concrete), Pipe Supplier, Plane Asphalt Concrete, Portland Cement & Concrete Pavement, Potholing, Ready-Mix Supply, Recycle, Reclaim Asphalt Concrete, Reinforced Concrete Pipe, Reinforcing Bar Section Supplier, Reinforcing Steel, Reset/Adjust Roadway Items, Roadside Sign, Roadway Excavation, Safety Manager, Sand & Gravel Supplier (Bulk Item), Sawcutting, Sewer Manhole, Signal, Signal & Lighting, Soil Amendments, Soldier Pile Walls, Speed Monitoring Station, Storm Drain Manhole, Storm Water Systems Supplier, Street Sweeping Truck, Structure Backfill, Structure Excavation, Subsurface Drain, Super 10 Dump Truck, Survey Or Historical Monument, SWPPP Planning, Temporary Erosion Control , Temporary Fencing, Thermoplastic Traffic Striping & Marking, Traffic Control Manager, Traffic Control System, Traffic Count Station, Traffic Engineer, Traffic Management Operations, Transfer Dump Truck, Trucking, Underground, Vibration Monitoring, Water Meter & Temp Facilities, and Water Truck.
PLEASE SUBMIT QUOTES BY EMAIL TO SM82BIDS@TEICHERT.COM
Plans and specifications will be available through an online plan room, Building Connected, as well as in person at the Teichert Pleasonton Office. Please email SM82BIDS@TEICHERT.COM or call the contact below to request access to the documents.
This project has a 23% DBE Goal. In addition to a request for participation from DBE subcontractors and suppliers, Teichert Construction requests non-DBE subcontractors to provide lower-tier DBE participation. Bidders are required to indicate lower-tier DBE participation information to be evaluated as part of their quote.
Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation is also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier, and Trucker quotes must be valid for 180 days from submission. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid.
Subcontractors are required to possess and maintain a current contractor's license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5.
A VIRTUAL PROJECT PRE-BID MEETING WILL BE HELD on JUNE 20, 2025 9-10:30AM
Register here: https://shorturl.at/i7Mri
Teichert Construction
5200 Franklin Drive #115, Pleasanton, CA 94588
Phone: (925) 621-5700
Email: SM82Bids@teichert.com
Point of Contact: Arsenio Marcelo, Estimator
WE ARE AN EQUAL OPPORTUNITY EMPLOYER
Teichert Construction - Contract No. 04-0K81U4 State Route 82 CMGC